Cette consultation a eu lieu :
du 27 juillet 2026
au 10 septembre 2026
Résumé de la décision
Hydro One Networks Inc. requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn, and no approval was issued.
Détails de l'emplacement
Adresse du site
Highway 525
Kenora,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
HYDRO ONE NETWORKS INC
483 Bay Street East, Floor TCT12
Toronto,
ON
M5G 2P5
Canada
Détails de la décision
Hydro One Networks Inc. requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn, and no approval was issued.
On September 1, 2026, Hydro One Networks Inc. requested to withdraw their application for an Environmental Compliance Approval.
The application is considered withdrawn, and no approval was issued. The ministry closed the file on September 14, 2026.
Effets de la consultation
No comments were received.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Proposition initiale
Détails de la proposition
The proposal is for a new Environmental Compliance Approval for industrial stormwater management works serving Hydro One Networks Inc., located at the Whitedog Distribution Station in Whitedog, Ontario.
The stormwater management works comprise of Stormwater Quality Control and Quantity Control, and include two new transformers (T1 and T2) with associated oil-containment systems. The clean effluent will discharge to the ditch located at the northeast corner of the property and ultimately discharge to the Winnipeg River.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 27 juillet 2026
au 10 septembre 2026
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0