Cette consultation a eu lieu :
du 12 juin 2026
au 12 juillet 2026
Résumé de la proposition
This proposal is for a renewal to Permit to Take Water No. 4175-AB4RS4 for Thomas Cavanagh Construction Limited. Water will be taken from two ponds for construction, aggregate extraction, and aggregate washing, located in the Township of Huntley, Ontario.
Détails de l'emplacement
Adresse du site
Lot 14 and 15, Concession 11
Huntley
Ottawa,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Thomas Cavanagh Construction Limited
9094 Cavanagh Road
Ashton,
ON
K0A 1B0
Canada
Détails de la proposition
This proposal is for a renewal to Permit to Take Water No. 4175-AB4RS4 for Thomas Cavanagh Construction Limited. Water will be taken from two ponds for construction, aggregate extraction, and aggregate washing, located in the Township of Huntley, Ontario. Details of the water taking are as follows:
Permit type – Renewal
Source Name: Natural Pond
- Purpose: construction
- Maximum rate per minute (litres): 2,046
- Maximum number of hours of taking per day: 24
- Maximum volume per day (litres): 454,609
- Maximum number of days of taking per year: 264
- Earliest calendar date of taking (mm/dd): 01 March
- Latest calendar date of taking (mm/dd): 31 December
- Period of taking: 10 years
Source Name: Quarry Sump (dewatering)
- Purpose: Aggregate Extraction
- Maximum rate per minute (litres): 17,280
- Maximum number of hours of taking per day: 24
- Maximum volume per day (litres): 24,883,200
- Maximum number of days of taking per year: 365
- Earliest calendar date of taking (mm/dd): 01 January
- Latest calendar date of taking (mm/dd): 31 December
- Period of taking: 10 years
Source Name: Quarry Sump (dewatering)
- Purpose: Aggregate Washing
- Maximum rate per minute (litres): 17,280
- Maximum number of hours of taking per day: 24
- Maximum volume per day (litres): 6,000,000
- Maximum number of days of taking per year: 365
- Earliest calendar date of taking (mm/dd): 01 January
- Latest calendar date of taking (mm/dd): 31 December
- Period of taking: 10 years
Source Name: Quarry Sump (dewatering)
- Purpose: Construction
- Maximum rate per minute (litres): 3,000
- Maximum number of hours of taking per day: 24
- Maximum volume per day (litres): 700,000
- Maximum number of days of taking per year: 365
- Earliest calendar date of taking (mm/dd): 01 January
- Latest calendar date of taking (mm/dd): 31 December
- Period of taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 12 juin 2026
au 12 juillet 2026