Cette consultation se termine à 23 h 59 le :
16 novembre 2026
Résumé de la proposition
This proposal is for a new Environmental Compliance Approval for the establishment of seasonal subsurface sewage disposal works rated at 34,600 litres per day, to service a youth summer camp (Camp Davern) located at 3555 Bolingbroke Road, in the community of Maberly, Township of Tay Valley, Ontario.
Détails de l'emplacement
Adresse du site
3555 Bolingbroke Road
Maberly,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Camp Davern Inc.
3555 Bolingbroke Road
Maberly,
ON
K0H 2B0
Canada
Détails de la proposition
This proposal is for a new Environmental Compliance Approval for the establishment of seasonal subsurface sewage disposal works rated at 34,600 litres per day, to service a youth summer camp (Camp Davern) located at 3555 Bolingbroke Road, in the community of Maberly, Township of Tay Valley, Ontario.
The proposed works includes the replacement of the existing sewage system serving the washrooms, existing dining hall (to be converted to a recreation hall), and laundry building, and a new sewage system for the proposed dining hall.
The replacement sewage works have a rated capacity of 13,000 litres per day and includes two 22,000-litre single compartment pre-cast concrete septic tanks, a 7,500-litre pre-cast concrete pump tank, and a 14,000-litre pre-cast concrete pump tank. Effluent from the replaced works will be discharged into a proposed partially raised chamber leaching bed with 15 runs of 24 chambers (360 cambers total).
The new sewage works will have a rated capacity of 21,600 litres per day and include a 11,365-litre three-compartment pre-cast concrete grease interceptor, three 22,000-litre single compartment pre-cast septic tanks connected in series, and a 22,000-litre pre-cast pump tank. Effluent from the new works will be discharged into a proposed fully raised leaching chamber bed with two cells of 14 runs of 22 cambers (616 cambers total).
The Ministry may require effluent monitoring and may impose effluent limits.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada