Le présent avis porte sur une décision qui n’était pas assujettie au processus de consultation normal. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Détails de l'emplacement
Adresse du site
623 King Ave E
Newcastle ,
ON
L1B1K7
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowDétails de la proposition
JFL REALTY INC.
623 King Avenue East
Newcastle ,
ON
L1B 1K7
Canada
Pourquoi une consultation n’est pas nécessaire
The ministry has relied on section 29 of the Environmental Bill of Rights, 1993 (EBR), as it is the Director’s opinion that the delay in giving notice to the public of the proposal for the instrument, allowing for public participation, and in considering the response to the notice would have resulted in:
- Danger to the health and safety of any person.
- Harm or serious risk of harm to the environment; or
- Injury or damage or serious risk of injury or damage to any property.
The ministry is posting this exception notice to give notice of its decision to rely on section 29 of the EBR.
Détails de l'exception
A new Environmental Compliance Approval Number A-500-6398576417 was issued to JFL Realty Inc. on November 10, 2026, for replacement sewage works for the treatment and disposal of sanitary sewage, to serve a year round mobile home park located at 623 King Avenue East, Newcastle, Municipality of Clarington.
It was the opinion of the director that posting the proposed instrument for public comments would have resulted in danger to the health or safety of any person interacting with the residential site, harm or serious risk of harm to the environment, and injury or damage or serious risk of injury or damage to the property, as outlined below:
- The existing septic bed serving the mobile home park is failing, with the sewage works experiencing additional input after heavy rainfall events, requiring frequent pump outs to avoid further leaks or spills of sewage into the environment.
- This condition was determined to be an environmental adverse effect requiring immediate remediation. The existing septic tanks are being pumped out until the replacement system can be installed.
- A replacement system including new septic tanks, pre-treatment/balancing tank, and the construction of a new combined subsurface treatment and dispersal system is required to prevent further environmental impacts.
- An Environmental Registry (EBR) posting was not required because the replacement system is necessary to address an urgent environmental protection issue.
Details of issued Environmental Compliance Approval
The ministry has issued a new Environmental Compliance Approval (sewage) to JFL Realty Inc. for the usage and operation of the Works, rated at a Maximum Daily Flow of 11,100 litres per day.
The year round mobile home park consist of 19 park model units, three-unit residential building and an office building. The replacement sewage system services 18 park model units and the office building, while an existing sewage system continues to service one park model unit and the three-unit residential building.
The replacement system consists of additional septic tanks, a pre-treatment/balancing tank and a new combined treatment and dispersal bed.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Personne-ressource
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada