Update Announcement
This notice was updated on April 4, 2024 to advise the public that there has been no change to the status of the proposal and it is still being considered. No additional opportunity for comment is being provided for at this time.
Cette consultation a eu lieu :
du 18 avril 2016
au 18 mai 2016
Résumé de la proposition
An application has been made by William Day Construction Limited to amend their current site plan for Licence # 15347, to permit extraction within the water table. A Hydrogeological Assessment Level 1 has been prepared to support the application.
Détails de l'emplacement
Détails de l'emplacement du site
Maclennan Township, City of Greater Sudbury
SW ¼ of Lot 6, Concession 1
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
William Day Construction Limited
2500 Elm Street
Post Office Box Delivery 1060
Azilda,
ON
P0M 1B0
Canada
Détails de la proposition
Proposal updates
This notice was updated on November 12, 2019 to advise the public that there has been no change to the status of the proposal and it is still being considered. No additional opportunity for comment is being provided for at this time.
Description of instrument
An application has been made by William Day Construction Limited to amend their current site plan for Licence # 15347, to permit extraction within the water table. A Hydrogeological Assessment Level 1 has been prepared to support the application. Licence #15347 has a licenced area of 32.4 hectares and an annual tonnage limit of 250,000 tonnes. If approved, the amendment would change the final rehabilitation to allow for the creation of a pond, lake or wetland. Sloping would continue at the required 3:1 ratio both above and below the water table.
Other information
Information regarding this proposed site plan amendment is available at the Ministry of Natural Resources and Forestry Sudbury District Office. Making an appointment to view the information is recommended to ensure aggregate staff will be available to provide information and answer questions.
Comments received through the EBR should not be construed as an objection under the ARA in accordance with Section 4.0 – Notification and Consultation Standards of the Aggregate Resources of Ontario Provincial Standards. The ARA may be viewed at the web-link provided:
Other public consultation opportunities
Since this is considered a major site plan amendment under the ARA, this proposal will be sent to landowners within 120 metres of the site, the Ministry of the Environment and Climate Change, Ministry of Northern Development and Mines, the City of Greater Sudbury, the Nickel District Conservation Authority and Glencore Canada Corporation for their comments.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
Communiquer avec nous
Contact
Kendall Haddow
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 18 avril 2016
au 18 mai 2016