The Exploration Permit was issued and is valid for a period of 3 years.
Détails de l'emplacement
Détails de l'emplacement du site
To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or "Find a township" to search by township.
These activities are located approximately 22 kilometres southeast of Kirkland Lake in Catharine township.
Claim numbers:550424, 550425, 550426, 550427, 550428, 550429, 550430, 550431, 550432, 550433, 550434, 550435, 550436, 551306, 551307.
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Terry Link
P.O. Box 561
Kirkland Lake,
ON
P2N 3J5
Canada
Détails de la décision
The Exploration Permit was issued once all Aboriginal communities and the public had the opportunity to provide comment or raise their concerns. The accepted Exploration Permit is valid for a period of 3 years.
Effets de la consultation
No comments were received resulting in no impact on the decision whether or not to proceed with this proposal.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
How to Appeal
Les appels ne sont pas autorisés
Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.
Communiquer avec nous
Contact
Aisha Samuel
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Proposition initiale
Détails de la proposition
Terry Link has submitted an application to the Ministry of Energy, Northern Development and Mines as required under the Mining Act for prescribed early exploration activity.
The activities that this permit would allow Terry Link to carry out are as follows:
Plan Activities:
- geophysical Survey Requiring Generator Type
- line Cutting (<1.5 metres in width)
Permit Activities:
- mechanized Drilling (Assembled Weight >150 kilograms)
- mechanized Stripping (>100 square metres in 200 metre radius)
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. Further all activities included in the Exploration Permit proposal must be carried out in compliance with O. Reg. 308/12 and the Provincial Standards for Early Exploration.
The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to 3 years.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 7 août 2019
au 6 septembre 2019
Communiquer avec nous
Contact
Aisha Samuel
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0