Cette consultation a eu lieu :
du 4 septembre 2019
au 4 octobre 2019
Résumé de la décision
The exploration permit was issued.
Détails de l'emplacement
Détails de l'emplacement du site
To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or "Find a township" to search by township.
These activities are located approximately 74 Kilometres North West of the town of Chapleau situated in Abigo township.
Claim numbers: 128145, 145645, 308198, 335776
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Jean Gaudreau
304 Tupper Street
Hanmer,
ON
P3P 1G6
Canada
Détails de la décision
The exploration permit was issued, Terms and Conditions were not added as no concerns were raised during the Ministry’s Exploration Permit Review process. The exploration permit is valid for 3 years from the date of issue.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
933 Ramsay Lake Road
Floor B6
Sudbury,
ON
P3E 6B5
Canada
How to Appeal
Les appels ne sont pas autorisés
Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.
Communiquer avec nous
Contact
Suzanne Halet
933 Ramsay Lake Road
Floor B6
Sudbury,
ON
P3E 6B5
Canada
Proposition initiale
Détails de la proposition
Jean Gaudreau has submitted an application to the Ministry of Energy, Northern Development and Mines as required under the Mining Act for prescribed early exploration activities.
The activities that this permit would allow Jean Gaudreau to carry out are as follows:
Permit Activities
- mechanized Drilling (Assembled Weight greater than 150 kilograms)
Plan Activities
- geophysical Survey Requiring Generator Type
- line Cutting (less than 1.5 metre width)
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. Further all activities included in the Exploration Permit proposal must be carried out in compliance with O. Reg. 308/12 and the Provincial Standards for Early Exploration.
The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to 3 years.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
933 Ramsay Lake Road
Floor B6
Sudbury,
ON
P3E 6B5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 4 septembre 2019
au 4 octobre 2019
Communiquer avec nous
Contact
Suzanne Halet
933 Ramsay Lake Road
Floor B6
Sudbury,
ON
P3E 6B5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0