Cette consultation a eu lieu :
du 31 mars 2020
au 30 avril 2020
Résumé de la décision
The Director of Exploration has made a decision on the exploration permit application PR-20-000090 to Greenstone Gold Mines GP Inc. for early exploration activities near Geraldton.
The decision is to :Issue
Détails de l'emplacement
Détails de l'emplacement du site
To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or "Find a township" to search by township.
The mining claims are located approximately 4 kilometres south west of Geraldton, Ontario, in Errington Township District of Thunder Bay, North West Region.
Mining Claims/Leases: MLO-10145, MLO-10147, MLO-10148, MLO-10149
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Greenstone Gold Mines GP Incorporated
2381 Bristol Circle
Suite B203
Oakville,
ON
L6H 5S9
Canada
Détails de la décision
On August 14, 2020 the ministry issued exploration permit near Geraldton to undertake early exploration activities.
The activities that this permit allows Greenstone Gold Mines GP Inc. to carry out are as follows:
- mechanized Drilling (where the drill weight is greater than 150 kilograms)
- mechanized Stripping (greater than 100 square metres in a 200 metres radius)
The potential disturbance from the activities are described as:
Mechanized Surface Stripping: uses heavy equipment to remove vegetation and soil (overburden) from bedrock. The potential environmental disturbance includes (but are not limited to): use of heavy equipment such as bulldozers, backhoes, excavators or forest harvest equipment, to remove soil from the bedrock, washing the bedrock by pumping water from nearby lakes, rivers or streams, and creation of access trails.
Exposed rock as well as excavation or blasting of rock leaving shallow holes or trenches that vary in depth and length from the use of heavy equipment.
Drilling: provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.
Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).
This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to three years.
The exploration permit was issued once all Indigenous communities and the public had the opportunity to provide comment or raise their concerns. The issued exploration permit is valid for a period of three years from the date of issue
Effets de la consultation
No comments was received through the Environmental Registry of Ontario resulting in no impact on the decision to proceed or not with this proposal.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
How to Appeal
Les appels ne sont pas autorisés
Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.
Communiquer avec nous
Contact
Kristen Wiebe
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Proposition initiale
Détails de la proposition
Greenstone Gold Mines GP Incorporated has submitted an application on the claims listed below for an exploration permit as required under the Mining Act for the following early exploration activities:
- mechanized Drilling (greater than 150 kilograms)
This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 31 mars 2020
au 30 avril 2020
Communiquer avec nous
Contact
Kristen Wiebe
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0