Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO 019-3223 on March 1, 2021.
Cette consultation a eu lieu :
du 7 avril 2020
au 22 mai 2020
Résumé de la proposition
This proposal for an issuance of an Environmental Compliance Approval 20-TIM-44376 for Dufour Waste Disposal Inc. for a hauled sewage disposal site in Moonbeam, Ontario.
Détails de l'emplacement
Adresse du site
Fauquier,
ON
P0L 1V0
Canada
Détails de l'emplacement du site
Moonbeam Lagoons Parcel 1256
Lot 21 Concession 6 Moon beam, Ontario
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Dufour Waste Disposal Inc.
144 Brunelle Road South
Kapaskaping,
ON
P5N 2X7
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Détails de la proposition
Description of instrument:
Hauled sewage, commonly known as septage, is the waste material removed from portable toilets, sewage holding tanks and septic systems. Untreated hauled sewage from holding tanks and septic tanks may be disposed of on land in accordance with an Environmental Compliance Approval (ECA) issued under the Environmental Protection Act (EPA)
Other information:
- site location: Moonbeam Lagoons Parcel 1256
- application type: renewal
- total useable area: 15 hectares
- type of disposal: dewatering trench
Highlights of proposed approval requirements
Prior to operating at the site, the company shall develop written procedures covering the following:
- procedures for reporting to the ministry, and municipal authorities as required in the event a spill occurs at the site
- a list of the personnel responsible for operations at the site
The company shall ensure that all personnel involved in the operation of this hauled sewage disposal site are aware of the requirements of this approval and are trained in Spill Prevention.
Spills of a pollutant that cause or may cause an adverse effect are to be reported to the Ministry's Spills Action Centre and the company shall take appropriate remedial action to limit the impact. The company must ensure that no unnecessary off-site effects, such as vermin, vectors, odour, dust, litter, noise or traffic, result from the operation of this site.
Written records must be maintained in a log book that documents daily operations as well as any spills that occur and any complaints received.
The six dewatering trenches must be designed and constructed according to specified standards set out in the approval.
The dewatering trenches must be operated in accordance with specified standards set out in the approval which include maximum volumes that can be put in a trench, rotating the use of the trenches, ensuring trenches have a rest period and cleaning residuals from the trenches on a regular basis.
A closure plan shall be developed for the site and the site must be closed in accordance with the plan.
The following types of monitoring conditions will be required: None.
Financial assurance will not be required.
Other:
Prior to the spreading of hauled sewage, the operator is responsible for ensuring that all necessary approvals, licenses or permits that may be required from other authorities, such as the local municipality, conservation authority, MNRF, and OMAFRA, have been acquired.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5520 Hwy 101 E
PO Bag 3080
South Porcupine,
ON
P0N 1H0
Canada
Communiquer avec nous
Contact
Alyssa Dufresne
5520 Hwy 101 E
PO Bag 3080
South Porcupine,
ON
P0N 1H0
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 7 avril 2020
au 22 mai 2020