Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO 019-2916 on February 2, 2021.
Cette consultation a eu lieu :
du 9 avril 2020
au 9 mai 2020
Résumé de la proposition
This proposal is for a new Category 3 Permit application for The City of London for the purpose of construction dewatering for a proposed Infrastructure Renewal Program, Assignment D, Storm Sewer Outlet. Water will be taken from a servicing trench (drilled well) located on Watson Street, in the City of London, Ontario
Détails de l'emplacement
Adresse du site
Watson Street
London,
ON
N5Y 1E1
Canada
Détails de l'emplacement du site
Watson Street, London, City, County of Middlesex, N5Y 1E1
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
The Corporation of the City of London
300 Dufferin Ave
London,
ON
N6A 4L9
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Détails de la proposition
This proposal is for a new Category 3 Permit application for The City of London for the purpose of construction dewatering for a proposed Infrastructure Renewal Program, Assignment D, Storm Sewer Outlet. Water will be taken from a servicing trench (drilled well) located on Watson Street, in the City of London, Ontario
Permit type - new (Category 3)
Source of water: servicing trench (drilled well)
- purpose of water taking: construction dewatering
- maximum rate (litres per minute): 1,483.00
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 2,135,000.00
- maximum number of days of taking in a year: 200
- earliest calendar date of taking (mm/dd): 06/01
- latest calendar date of taking (mm/dd): 01/31
- period of water taking: 2 years
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Permit to take water coordinator (South west region)
733 Exeter Road
London,
ON
N6E 1L3
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 9 avril 2020
au 9 mai 2020