Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO 019-2036 on July 2, 2020
Cette consultation a eu lieu :
du 20 avril 2020
au 4 juin 2020
Résumé de la proposition
This proposal is for a new Environmental Compliance Approval (Sewage) to be issued to 1157391 Ontario Inc., for the establishment of storm sewers, a ditch, low impact development techniques and a dry detention basin to manage runoff from the lands located south of the 15/16 Sideroad East, and on the west side of the 11th Line North, in Oro-Medone.
Détails de l'emplacement
Adresse du site
Township of Oro-Medonte,
ON
L0L 1T0
Canada
Détails de l'emplacement du site
Lot 16, Concession 11
East Oro Estates
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
1157391 Ontario Inc.
950 Shoreview Drive
Innisfil,
ON
L9S 5A7
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Détails de la proposition
This proposal is for a new Environmental Compliance Approval (Sewage) to be issued to 1157391 Ontario Inc.
The proposal is for the construction of stormwater management structure facilities, provided through storm sewers, a ditch, low impact development techniques, and a dry detention basin for water quantity and quality control, in support of a proposed 10-lot estate residential subdivision.
The works will manage runoff from the lands located south of the 15/16 Sideroad East, and on the west side of the 11th Line North, in the Community of East Oro, Township of Oro-Medonte, Ontario.
The runoff will be directed to a storm sewer, which discharges into Oro Creek North, which is part of the Lake Simcoe Watershed.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 20 avril 2020
au 4 juin 2020