Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO 019-3710 on May 21, 2021.
Cette consultation a eu lieu :
du 11 mai 2020
au 25 juin 2020
Résumé de la proposition
The ministry has accepted the risk assessment prepared for the owner, Suncor Energy Inc., as part of the development plans for property at 2410 Finch Avenue West. The director is considering issuing a Certificate of Property Use ("CPU") in relation to the property.
Détails de l'emplacement
Adresse du site
2410 Finch Avenue West
Toronto,
ON
M9M 2C8
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Suncor Energy Inc.
3275 Rebecca Street
Oakville,
ON
L6L 6N5
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Détails de la proposition
A risk assessment was undertaken for this property to establish the risks that the contaminants identified in the risk assessment may pose to future users and to identify appropriate risk management measures to be implemented to ensure that the property is suitable for the intended use of commercial or industrial as defined by O. Reg 153/04 (the "Regulation"), as amended, made under the Environmental Protection Act (the "Act").
The ministry has accepted the risk assessment prepared for the owner as part of the development plans for the property.
Based on the documents provided to the ministry as part of the risk assessment reports, the reviewers confirmed that the risk assessment has been conducted in accordance with the Act, the Regulation, and the associated guidance documents.
The director provided the proponent with written Notice of the Director’s Decision to accept the risk assessment relating to the property in accordance with s.168.5 of the Act on April 1, 2020.
The director is considering issuing a Certificate of Property Use ("CPU") in relation to the property. The CPU incorporates the risk management measures proposed in the risk assessment and any additional conditions proposed by the director. A Section 197 Order is included and requires that a certificate be registered on the property title in accordance with section 197 of the Act and that before dealing with the property in any way, a copy of the CPU must be given to any person who will acquire an interest in the property.
The proposed risk management measures include:
- property use restrictions
- building construction restrictions
- barrier to site soils
- an inspection and maintenance program for the barrier to site soils
- air and groundwater monitoring programs
- prepare and implement a health and safety plan and a soil management plan
- reporting requirements
The proposed draft CPU No. 2408-BNFG3V including the Section 197 Order, is provided as a link under the Supporting Materials section of this notice.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Richard Saunders
5775 Yonge Street
8th Floor
Toronto,
ON
M2M 4J1
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 11 mai 2020
au 25 juin 2020