Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO 019-1792 on August 20, 2021.
Cette consultation a eu lieu :
du 15 mai 2020
au 14 juin 2020
Résumé de la proposition
This proposal is for a new Permit to Take Water for Monarch Waterview Development Limited for short term construction/dewatering and long term drainage for a project located at 65 & 70 Annie Craig Drive, Toronto.
Détails de l'emplacement
Adresse du site
65 and 70 Annie Craig Drive
Toronto,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Monarch Waterview Development Limited
7880 Keele Street
Vaughan,
ON
L4K 4G7
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Détails de la proposition
This proposal is for a new Permit to Take Water for Monarch Waterview Development Limited for short term construction/dewatering and long term drainage for a project located at 65 & 70 Annie Craig Drive, Toronto.
The water taking is as follows:
Source 1:
- source name: construction/dewatering
- purpose of taking: well for construction/dewatering
- maximum rate per minute (litres per minute): 265
- maximum number of hours of taking per day: 24
- maximum volume of taking per day: 382,000 litres
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- length of taking: 1 year
Source 2:
- source name: foundation drainage
- purpose of taking: well for foundation drainage
- maximum rate per minute (litres per minute): 102
- maximum number of hours of taking per day: 24
- maximum volume of taking per day: 146,880 litres
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- length of taking: 10 years
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Permit To Take Water Coordinator (Central Region)
5775 Yonge Street
Floor 8
Toronto,
ON
M2M 4J1
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 15 mai 2020
au 14 juin 2020