Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO 019-3498 on April 16, 2021.
Cette consultation a eu lieu :
du 9 juin 2020
au 24 juillet 2020
Résumé de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air) for CRH Canada Group Inc., operating a ready-mix concrete batching plant located in the City of Toronto, Ontario.
Détails de l'emplacement
Adresse du site
8 Unwin Avenue
Toronto,
ON
M5A 3L1
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
CRH Canada Group Inc.
2300 Steeles Avenue West
Floor 4
Concord,
ON
L4K 5X6
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air), which replaces all the current Environmental Compliance Approvals for Air at this facility, and includes the addition of new, or historically unapproved, sources for all emissions from CRH Canada Group Inc., a ready-mix concrete batching plant located in the City of Toronto, Ontario.
The application includes all sources at the facility, including:
- the delivery of raw materials
- production
- shipping
- all ancillary sources and processes at the site
This amendment is to reflect changes to the facility including the:
- relocation of the plant to a new area within the same site
- replacement of the plant with new equipment and configuration
Emissions to the air from this facility include total suspended particulate, calcium oxide, crystalline silica, and nitrogen oxides.
The Environmental Compliance Approval with Limited Operational Flexibility (Air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air).
The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 9 juin 2020
au 24 juillet 2020