Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO 019-2092 on July 14, 2020.
Cette consultation a eu lieu :
du 10 juin 2020
au 10 juillet 2020
Résumé de la proposition
The Ministry is proposing to issue a permit to Kleinboeck to undertake this early exploration activity: Geophysical Survey Requiring Generator and Drilling. The location of the activities is in the Township of Scholes.
Détails de l'emplacement
Détails de l'emplacement du site
The mining activities are located approximately 73 kilometres north east of Sudbury, Ontario, in the Townships of Scholes, Sudbury Mining Division, South Region.
Claim numbers instructions: “To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.”
Claim numbers: 107594, 124023, 176023, 193394, 222610, 235304, 297305, 309982, 316028, 320185
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Joerg Kleinboeck
147 Lakeshore Drive
North Bay,
ON
P1A 3E1
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated. Notwithstanding the exemption, ENDM posted a proposal for this instrument for consultation, and has taken any responses received as a result of the posting into account.
Détails de la proposition
Joerg Kleinboeck has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.
The activities that this permit would allow Joerg Kleinboeck to carry out are as follows:
Plan Activities:
- geophysical Survey Requiring Generator Type
Permit Activities:
- mechanized Drilling (where the drill weight is greater than 150 kilograms)
The potential disturbance from the activities are described as:
Drilling: provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.
Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).
This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to three years.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
933 Ramsay Lake Road
Floor B6
Sudbury,
ON
P3E 6B5
Canada
Communiquer avec nous
Contact
Rebecca Van Kempen
933 Ramsay Lake Road
Floor B6
Sudbury,
ON
P3E 6B5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 10 juin 2020
au 10 juillet 2020