Le présent avis est fourni à titre d’information seulement. Il n’existe aucune obligation de mener une consultation sur le Registre environnemental de l’Ontario à propos de cette initiative. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.

Résumé de l’avis

We have approved a new Environmental Compliance Approval No. 6155-BRLUY5 to Michael Hartshorn for the establishment of stormwater management works for the proposed light industrial development, located on the north side of Industrial Drive, in Mount Forest, Ontario.

Pourquoi une consultation n’est pas nécessaire

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempted all proposals for policies, acts, regulations and instruments from posting requirements under the EBR.

Ontario Regulation 115/20 was revoked on June 15, 2020, however, we are posting this decision as a bulletin because the proposal was posted on April 28, 2020 while Ontario Regulation 115/20 was in effect.

Although consultation was not required, the ministry did consult with the public on this proposal by posting ERO # 019-1704 for public comment from April 28, 2020 - June 12, 2020. To ensure transparency, the ministry is providing details of its decision and the effects of consultation on decision-making in this notice.

Détails

Proponent(s)

Michael Hartshorn
9527 O-Dwyers Road
Minto, ON
N0G 1Z0
Canada

Site location details

Industrial Drive
Wellington, ON
N0G 2L1
Canada

To see the site location on a map, refer to the instrument proposal under ERO# 019-1704.

Instrument decision details

Stormwater management works is proposed for the collection, treatment and disposal of stormwater run-off from catchment areas within the 0.37 ha site to provide enhanced level water quality control and to attenuate post-development peak flows to pre-development levels for all storm events up to and including the 100-year storm event, discharging to an existing 300 mm diameter municipal storm sewer on Industrial Drive, consisting of the following:

  • swale taking external drainage away from the site
  • one dry pond attenuate post-development peak flows to pre-development levels for all storm events up to and including the 100-year storm event.
  • one oil and grit separator for quality control

Comments received

  • 0 received through the registry
  • 0 received by mail
  • 0 received by email

Effects of consultation

Third parties are not able to apply for leave to appeal in respect of proposals which are posted while Ontario Regulation 115/20 is in effect. On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak which exempts all proposals from the requirement to post notices on the ERO. Leave to appeal may only be sought in respect of instruments that are required to be posted to the ERO.

Appeal Information

Appeals are not allowed.

This instrument type cannot be appealed.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis