Cette consultation a eu lieu :
du 10 août 2020
au 24 septembre 2020
Résumé de la décision
The facility is closed down as of November 27, 2020 and the application was cancelled at the request of the proponent.
Détails de l'emplacement
Adresse du site
48 Bury Court
Brantford,
ON
N3S 7V2
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Specialty Polymer Coatings, Inc.
48 Bury Court
Brantford,
ON
N3S 0B1
Canada
Détails de la décision
The facility is closed down as of November 27, 2020 and the application was cancelled at the request of the proponent. No approval was issued.
Effets de la consultation
No comments were received.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
How to Appeal
Appeals are not allowed
The application was withdrawn by the proponent and no approval was issued.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air) which replaces all the current Environmental Compliance Approvals for Air at this facility, and includes the addition of new, or historically unapproved, sources for all emissions from Specialty Polymer Coatings, Inc., a manufacturing facility for epoxy coatings, located in Brantford, Ontario.
The application includes all sources at the facility, including:
- epoxy coating manufacturing
- epoxy bulk storage
- chemical storage
- sealer/decanting operations
Emissions to the air from this facility include:
- feldspar
- ethylene diamine
- talc
- crystalline silica-quartz-pm10
The Environmental Compliance Approval with Limited Operational Flexibility (Air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 10 août 2020
au 24 septembre 2020
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0