Le présent avis est fourni à titre d’information seulement. Il n’existe aucune obligation de mener une consultation sur le Registre environnemental de l’Ontario à propos de cette initiative. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempted all proposals for policies, acts, regulations and instruments from posting requirements under the EBR.
Ontario Regulation 115/20 was revoked on June 15, 2020, however, we are posting this decision as a bulletin as because the proposal was posted on June 9, 2020 while Ontario Regulation 115/20 was in effect.
Although consultation was not required, the ministry did consult with the public on this proposal by posting ERO# 019-1875 for public comment from June 9, 2020 to July 9, 2020. To ensure transparency, the ministry is providing details of its decision and the effects of consultation on decision-making in this notice
Détails
Proponent(s)
Monarch Berczy Glen Development Limited
7880 Keele Street
Suite 500
Vaughan, ON
L4K 4G7
Location details
3319 Elgin Mills Road East
Markham, ON
L6C 1L2
Please see ERO# 019-1875 to view location on a map.
Instrument decision details
This proposal was for a new Permit to Take Water for Monarch Berczy Glen Development Limited for the purpose of construction dewatering activities associated with a residential development in the City of Markham, Ontario. Permit No. 1164-BSUJSU was issued September 4, 2020 for a period of 2 years.
The water taking is as follows:
Source 1
- source name: SWM Pond
- maximum rate of per minute (litres): 970
- maximum number of hours of taking a day: 24
- maximum volume per day (litres): 1,396,100
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- length of taking: 2 years
Source 2
- source name: trench excavations
- maximum rate of per minute (litres): 1,105
- maximum number of hours of taking a day: 24
- maximum volume per day (litres): 1,591,900
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- length of taking: 2 years
Comments received
No comments were received.
Third parties are not able to apply for leave to appeal in respect of proposals which are posted while Ontario Regulation 115/20 is in effect.
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak which exempts all proposals from the requirement to post notices on the ERO. Leave to appeal may only be sought in respect of instruments that are required to be posted to the ERO.
Appeal information
Appeals are not allowed.
This instrument type cannot be appealed.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Permit to take water coordinator (Central region)
5775 Yonge Street
Floor 8
Toronto,
ON
M2M 4J1
Canada