Prodigy Gold Inc. - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-2586
Numéro de référence du ministère
1667-BTWNS8
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 16 octobre 2020 au 30 novembre 2020 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 16 octobre 2020
au 30 novembre 2020

Résumé de la décision

We have issued an Environmental Compliance Approval No. 5113-BWZKRY to Prodigy Gold Inc., for the collection, transmission, treatment, and disposal of snowmelt, precipitation, stormwater, groundwater seepage, and dewatering water to Spring Lake during the construction phase of the Magino Gold Project site, in the Finan Unorganized Township, ON.

Détails de l'emplacement

Adresse du site

Goudreau Road
(approximately 10 kilometres southeast of Dubreuilville)
Finan, ON
P0S 1B0
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Prodigy Gold Inc.
3 Dree Road
Dubreuilville, ON
P0S 1B0
Canada

Détails de la décision

Sewage works for the construction phase of the Magino Gold Project site consist of the following:

  • ditching, sumps, and conveyance system designed to collect and convey snowmelt, precipitation, stormwater, groundwater seepage, and dewatering water from the Plant Site Area, Open Pit Area, and MRMF and Overburden Stockpile and treatment is provided by the existing tailings pond, polishing pond, and Lovell Lake Treatment Pond
  • dams, surge ponds, sumps, and conveyance system are designed to collect and convey snowmelt, precipitation, stormwater, groundwater seepage, and dewatering water from the construction areas of TMF Stage 1 Embankment and the water quality control pond, and treatment is provided by the Water Quality Control Pond (WQCP) (formerly known as Waterbody 7) and Waterbody 3 Sediment Pond (formerly known as Waterbody 3)
  • non-contact water from dewatering activities associated with construction of the TMF Stage 1 Embankment is collected by dams, surge ponds, sumps, and conveyance system, discharging directly or indirectly to Lovell Lake or Spring Lake
  • also some sewage works for the collection, transmission, treatment, and disposal of water from dewatering activities to support fish salvage activities.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number
Sault Ste. Marie Area Office
Address

70 Foster Drive
Suite 110
Sault Ste. Marie, ON
P6A6V4
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 22 février 2021 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.

Appeal process for decisions published before June 1, 2021

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON 
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Fariha Pannu
Manager

Environmental Assessment and Permissions Branch
1st Floor, 135 St Clair Ave W
Toronto, ON
M4V 1P5
Canada

416-314-7092

Proponent(s)

Prodigy Gold Inc.
3 Dree Road
Dubreuilville, ON
P0S 1B0
Canada


Organe d’appel

Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Environmental Review Tribunal


Inclure les éléments suivants:

Numéro du REO
019-2586
Numéro de référence du ministère
1667-BTWNS8

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-2586
Numéro de référence du ministère
1667-BTWNS8
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

16 octobre 2020 - 30 novembre 2020 (45 days)

Détails de la proposition

The proposal is for a new Environmental Compliance Approval (Construction Phase) for industrial sewage treatment and stormwater management works, for a new approximately 10,000 tonne per day open pit gold mine and processing facility (the Magino Project) being developed by Prodigy Gold Inc., approximately 40 km northeast of Wawa Ontario at the site of a former underground gold mine.

Industrial sewage treatment works will consist of collection systems and sediment/aging ponds for the management of runoff and seepage contact waters derived from:

  • construction of the ore processing plant
  • initial development of the open pit to supply construction rock
  • construction of Tailings Management Facility Stage 1 dams and the Water Quality Control Pond

Construction phase effluents from these facilities will be discharged from two final effluent control ponds (Lovell Lake and Waterbody 3) to the Spring Lake and the McVeigh Creek system. The effluent treatment works are designed to achieve protection of aquatic life criteria at the final discharge points.

Stormwater management works will consist of on-site ditching and detention ponds to direct contact waters to the sewage treatment works, and clean, non-contact water away from the treatment works.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number
Sault Ste. Marie Area Office
Address

70 Foster Drive
Suite 110
Sault Ste. Marie, ON
P6A6V4
Canada