Le présent avis est fourni à titre d’information seulement. Il n’existe aucune obligation de mener une consultation sur le Registre environnemental de l’Ontario à propos de cette initiative. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Ontario Regulation 115/20 was revoked on June 15, 2020, however, we are posting this decision as a bulletin because the proposal was posted on April 9, 2020, while Ontario Regulation 115/20 was in effect.
Although consultation was not required, the ministry did consult with the public on this proposal by posting ERO# 019-1622 for public comment from April 9, 2020 - May 9, 2020. To ensure transparency, the ministry is providing details of its decision and the effects of consultation on decision-making in this notice.
Détails
Instrument details
Permit to Take Water No. 5571-BQLKFS was issued on June 15, 2020 for 2 years. The proposal was for a new Category 3 Permit application for the City of London for the purpose of construction dewatering for a proposed Infrastructure Renewal Program, Assignment D, Storm Sewer Outlet. Water will be taken from a servicing trench (drilled well) located on Watson Street, in the City of London, Ontario.
Permit type - new (Category 3)
Source of water: servicing trench (drilled well)
- purpose of water taking: construction dewatering
- maximum rate (litres per minute): 1,483.00
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 2,135,000.00
- maximum number of days of taking in a year: 200
- earliest calendar date of taking (mm/dd): 06/01
- latest calendar date of taking (mm/dd): 01/31
- period of water taking: 2 years
Comments received
No comments were received
Effects of consultation
Since we did not receive any comments during the commenting period, there is no impact of comment on the permit.
Third parties are not able to apply for leave to appeal in respect of proposals which were posted while Ontario Regulation 115/20 was in effect between April 1, 2020 and June 14, 2020. Ontario Regulation 115/20 exempted all proposals for instruments from posting requirements under the EBR. Leave to appeal may only be sought in respect of instruments that are required to be posted to the ERO.
Appeal information
Appeals are not allowed. This instrument type cannot be appealed
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada