Toronto Hydro-Electric System Limited

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Numéro du REO
019-2918
Type d'avis
Bulletin
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Date d’affichage
Dernière mise à jour

Le présent avis est fourni à titre d’information seulement. Il n’existe aucune obligation de mener une consultation sur le Registre environnemental de l’Ontario à propos de cette initiative. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.

Résumé de l’avis

A new Environmental Compliance Approval has been issued for establishment of sewage works for the collection, transmission, treatment and disposal of stormwater at the Bellamy-Lawrence Station, located at 510 Bellamy Road North, in the City of Toronto, on behalf of Toronto Hydro-Electric System Limited.

Pourquoi une consultation n’est pas nécessaire

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempted all proposals for policies, acts, regulations and instruments from posting requirements under the EBR.

Ontario Regulation 115/20 was revoked on June 15, 2020, however, we are posting this decision as a bulletin because the proposal was posted on April 14, 2020 while Ontario Regulation 115/20 was in effect.

Although consultation was not required, the ministry did consult with the public on this proposal by posting ERO # 019-1560 for public comment from April 14, 2020 to May 29, 2020. To ensure transparency, the ministry is providing details of its decision and the effects of consultation on decision-making in this notice.

Détails

Proponent

Toronto Hydro-Electric System Limited
715 Milner Avenue
Toronto, ON
M1B 3C3
Canada

Location details

510 Bellamy Road North
Toronto, ON
M1H 1G3
Canada

To see the site location on a map, refer to the instrument proposal under ERO # 019-1560.

Instrument decision details

This approval is for replacement of the existing oil spill containment system for the Bellamy-Lawrence MS Substation designed to collect stormwater from up to 50 year storm event and any spill oil volume, and has a total design volume of approximately 8800 litres.

The works include a spill containment pit, containing a secondary oil containment system, and one detention pit/Infiltration basin

Comments received

No Comments were received.

Effects of consultation

Since we did not receive any comments during the commenting period, there is no impact of comment on the approval

Third parties are not able to apply for leave to appeal in respect of proposals which were posted while Ontario Regulation 115/20 was in effect between April 1, 2020 and June 14, 2020. Ontario Regulation 115/20 exempted all proposals for instruments from posting requirements under the EBR. Leave to appeal may only be sought in respect of instruments that are required to be posted to the ERO.

Appeal information

Appeals are not allowed. This instrument type cannot be appealed

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis