Cette consultation a eu lieu :
du 8 mars 2019
au 7 avril 2019
Résumé de la décision
PR-19-000034 Issued. The exploration permit is valid for 3 years from the date of issue
Détails de l'emplacement
Détails de l'emplacement du site
Claims 158719, 163600, 203386, 211475, 259461 and 343267 are located in Zealand Township, District of Kenora, NW Region.
These sites are located about 5 km east of Dryden, Ontario.
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Treasury Metals Incorporated - Adam Larsen
130 King Street West
Suite 3680
Toronto,
ON
M5X 1B1
Canada
Détails de la décision
PR-19-000034 Issued. The exploration permit is valid for 3 years from the date of issue
Effets de la consultation
No comments were received resulting in no impact on the decision whether or not to proceed with this proposal.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
How to Appeal
Les appels ne sont pas autorisés
Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.
Communiquer avec nous
Contact
Ronnie Therriault
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Proposition initiale
Détails de la proposition
Description of instrument
Treasury Metals Inc. has submitted an application as required under the Mining Act for prescribed early exploration activities.
The activities that this permit would allow Treasury Metals Inc. to carry out are as follows:
Plan Activities
- Geophysical Survey Requiring Generator Type
- Mechanized Stripping (<100m2 in 200 metre radius)
- Pitting and Trenching (>1m3, <=3m3 in 200 metre radius)
- Line Cutting (<1.5m width)
Permit Activities
- Mechanized Drilling (Assembled Weight >150kg)
- Mechanized Stripping (>100m2 in 200 metre radius)
- Pitting and Trenching of Bedrock (>3m3 in 200 metre radius)
- Line Cutting (>1.5m width)
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. Further all activities included in the Exploration Permit proposal must be carried out in compliance with O Reg. 308/12 and the Provincial Standards for Early Exploration.
The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to 3 years
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
933 Ramsey Lake Road
Level B6
Sudbury,
ON
P3E 6B5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 8 mars 2019
au 7 avril 2019
Communiquer avec nous
Contact
Ronnie Therriault
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0