Cette consultation a eu lieu :
du 1 septembre 2021
au 1 octobre 2021
Résumé de la décision
This decision is to renew and consolidate Permits To Take Water Nos. 3358-B9RRFG and 4688-B68QGY for Enbridge Pipelines Inc. for construction dewatering purposes in the Township of Blandford-Blenheim, the Township of North Dumfries and the City of Hamilton, Ontario.
Détails de l'emplacement
Adresse du site
Township of Blandford-Blenheim, the Township of North Dumfries and the City of Hamilton,
ON
Canada
Détails de l'emplacement du site
Start Mile Post 1833.6515:
Lot 24, Concession 9, Blenheim
Township of Blandford-Blenheim, County of Oxford
End Mile Post 1862.0733:
Lot 29, Range East of Plank Road, Beverly
City of Hamilton
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Enbridge Pipelines Inc.
10175 101 Street North West
Unit 200
Edmonton,
AB
T5J 0H3
Canada
Détails de la décision
This decision is to renew and consolidate Permits To Take Water Nos. 3358-B9RRFG and 4688-B68QGY for Enbridge Pipelines Inc. for construction dewatering purposes in the Township of Blandford-Blenheim, the Township of North Dumfries and the City of Hamilton, Ontario. Permit to Take Water Number 6313-C8VKYS was issued on December 16, 2021 for a period of 10 years.
Details of the water taking are as follows:
Permit type: renewal and consolidation
Source name: MP 1833.6515 to MP 1842.1670
- purpose of water taking: construction dewatering
- maximum rate (litres per minute): 2,000
- maximum number of hours of taking per day: 24
- maximum volume (litres per day): 13,500,000
- maximum number of day of taking in a year: 365
- period of water taking: January 1 to December 31 for 10 years
Source name: MP 1849.0000 to MP 1862.0733
- purpose of water taking: construction dewatering
- maximum rate (litres per minute): 1,200
- maximum number of hours of taking per day: 24
- maximum volume (litres per day): 10,500,000
- maximum number of day of taking in a year: 365
- period of water taking: January 1 to December 31 for 10 years
Other information
Enbridge Pipelines regularly performs preventative maintenance digs as part of the ongoing maintenance of the pipelines and is a necessary part of keeping our pipeline safe. Preventative maintenance digs are the mechanism used to visually inspect and verify features identified with inline inspection tools.
On occasion, surface water or groundwater needs to be diverted from the workspace to allow for the assessment of the pipeline. When this occurs the water is inspected, diverted from the dig locations, and returned to the environment in close proximity to the dig through controlled means. Filters are used when necessary to eliminate the risk of siltation of farmland or water bodies and the discharges are monitored. These activities will occur from various preventative maintenance digs within the Township of Blandford-Blenheim, the Township of Blandford-Blenheim, the Township of North Dumfries and the City of Hamilton.
Effets de la consultation
One comment was received looking for clarification on the volumes and purpose of this water taking. They also requested copies of the technical documents provided by the applicant. We responded to their questions informing them of the situation where Enbridge may require multiple “integrity dig sites” along this section of the pipeline and are required to dewater when investigating or fixing possible issues. The ministry also had Enbridge & their consultants directly provide technical documentation and answer any questions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
733 Exeter Rd
London,
ON
N6E 1L3
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 17 décembre 2021 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.
Appeal process for decisions published before June 1, 2021
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Enbridge Pipelines Inc.
10175 101 Street North West
Unit 200
Edmonton,
AB
T5J 0H3
Canada
Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
Details of the water taking are as follows:
Permit type: renewal and consolidation
Source name: MP 1833.6515 to MP 1842.1670
- purpose of water taking: construction dewatering
- maximum rate (litres per minute): 2,000
- maximum number of hours of taking per day: 24
- maximum volume (litres per day): 13,500,000
- maximum number of day of taking in a year: 365
- period of water taking: January 1 to December 31 for 10 years
Source name: MP 1849.0000 to MP 1862.0733
- purpose of water taking: construction dewatering
- maximum rate (litres per minute): 1,200
- maximum number of hours of taking per day: 24
- maximum volume (litres per day): 10,500,000
- maximum number of day of taking in a year: 365
- period of water taking: January 1 to December 31 for 10 years
More about Permits to take water
Other information
Enbridge Pipelines regularly performs preventative maintenance digs as part of the ongoing maintenance of the pipelines and is a necessary part of keeping our pipeline safe. Preventative maintenance digs are the mechanism used to visually inspect and verify features identified with inline inspection tools.
On occasion, surface water or groundwater needs to be diverted from the workspace to allow for the assessment of the pipeline. When this occurs the water is inspected, diverted from the dig locations, and returned to the environment in close proximity to the dig through controlled means. Filters are used when necessary to eliminate the risk of siltation of farmland or water bodies and the discharges are monitored. These activities will occur from various preventative maintenance digs within the Township of Blandford-Blenheim, the Township of Blandford-Blenheim, the Township of North Dumfries and the City of Hamilton.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 1 septembre 2021
au 1 octobre 2021
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
1Par la poste
0