Update Announcement
This proposal notice has been updated on February 27, 2024, to advise the public that this file/application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.
Cette consultation a eu lieu :
du 7 juin 2022
au 22 juillet 2022
Résumé de la proposition
This proposal is for a new multi-site (mobile) Environmental Compliance Approval (Geothermal) for 1700248 Ontario Inc. for the installation of vertical closed loop geothermal systems across the Province of Ontario.
Détails de l'emplacement
Adresse du site
ON
Canada
Détails de l'emplacement du site
Multiple Sites in Ontario
Promoteur(s)
1700248 Ontario Inc.
111 Highway 581 North
P.O. Box 265
Moonbeam,
ON
P0L 1V0
Canada
Détails de la proposition
This proposal is for a new multi-site (mobile) Environmental Compliance Approval (Geothermal) for 1700248 Ontario Inc. for the installation of vertical closed loop geothermal systems.
1700248 Ontario Inc. operates across Ontario drilling boreholes and installing closed loop geothermal heat exchangers in these boreholes.
The proposal is supported by a work plan prepared in accordance with Ontario Regulation 98/12 (Ground Source Heat Pumps) which includes measures taken to protect the public and the environment in the event that hazardous gas or flowing artesian conditions is encountered.
The multi-site (mobile) Environmental Compliance Approval will allow the installer to install vertical closed loop geothermal systems at locations throughout the Province.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 7 juin 2022
au 22 juillet 2022