Cette consultation a eu lieu :
du 7 juillet 2022
au 6 août 2022
Résumé de la décision
The Director of Exploration has made a decision on the exploration permit application PR-22-000207 to STARES CONTRACTING CORP. for early exploration activities .
The decision is to: the permit has been withdrawn.
Détails de l'emplacement
Détails de l'emplacement du site
The mining activities are located approximately 45 kilometres West of Thunder Bay Ontario, in Dawson Road Lots, Goldie Townships, District of Thunder Bay, Northwest Region.
To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.
Claim numbers: 136429, 137187, 142499, 169860, 171888, 209386, 211401, 221433, 237029, 237184, 257407, 267969, 267970, 304267, 311090, 334326
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
STARES CONTRACTING CORP
288 Cougar Cresent
Thunder Bay ,
ON
P7C 4V1
Canada
Détails de la décision
On August 9, 2022, the ministry proponent withdrew the proposed early exploration permit.
Effets de la consultation
On August 9, 2022, the ministry proponent withdrew the proposed early exploration permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
How to Appeal
Les appels ne sont pas autorisés
Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.
Communiquer avec nous
Contact
Stephen A. Miller
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Proposition initiale
Détails de la proposition
The proponent has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.
The activities that this permit would allow the proponent to carry out are as follows:
- mechanized surface stripping (greater than 100 square metres in a 200 metres radius)
- mechanized drilling (where the drill weight is greater than 150 kilograms)
The potential disturbance from the activities are described as:
Mechanized Surface Stripping: uses heavy equipment to remove vegetation and soil (overburden) from bedrock. The potential environmental disturbance includes (but are not limited to): use of heavy equipment such as bulldozers, backhoes, excavators or forest harvest equipment, to remove soil from the bedrock, washing the bedrock by pumping water from nearby lakes, rivers or streams, and creation of access trails.
Mechanized Drilling: provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.
Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).
This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of renewal.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 7 juillet 2022
au 6 août 2022
Communiquer avec nous
Contact
Stephen A. Miller
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0