Sturgeon Falls Brush and Contracting Limited - Licence for a forest resource processing facility

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Licence for a forest resource processing facility

Numéro du REO
019-5867
Type d'avis
Instrument
Loi
Crown Forest Sustainability Act, 1994
Affiché par
Ministry of Natural Resources and Forestry
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 15 août 2022 au 14 septembre 2022 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 15 août 2022
au 14 septembre 2022

Résumé de la décision

Approval was granted to Sturgeon Falls Brush and Contracting Limited to establish and operate a sawmill facility near Sturgeon Falls, Ontario.

Détails de l'emplacement

Détails de l'emplacement du site

The Municipality of West Nipissing in the District of Nipissing.

Patent lands at 12471 Highway 17E, Sturgeon Falls, Ontario, on Lot 9 Con 2, Pedley Township, District of Nipissing.

Promoteur(s)

Sturgeon Falls Brush and Contracting Limited
145 Main Street
Suite 425
Sturgeon Falls , ON
P2B 1N8
Canada

Détails de la décision

On December 22, 2022 we made a decision to issue a Type “C” Forest Resource Processing Facility Licence to Sturgeon Falls Brush and Contracting Limited to construct and operate a facility for a term of five years.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

There were no comments submitted as a result of consultation.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

MNRF - FID - Forest Industry Unit
Address

5520 Hwy 101 East, 2nd Floor
PO Bag 3020
South Porcupine, ON
P0N 1H0
Canada

How to Appeal

Les appels ne sont pas autorisés

Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.

Communiquer avec nous

Contact

Heather Farrer

Phone number
Office
MNRF - FID - Forest Industry Unit
Address

5520 Hwy 101 East, 2nd Floor
PO Bag 3020
South Porcupine, ON
P0N 1H0
Canada

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-5867
Type d'avis
Instrument
Loi
Crown Forest Sustainability Act, 1994
Affiché par
Ministry of Northern Development, Mines, Natural Resources and Forestry
Proposition affichée

Période de consultation

15 août 2022 - 14 septembre 2022 (30 days)

Détails de la proposition

The Ministry of Natural Resources and Forestry is considering the issuance of a type “C” forest resource processing facility licence to authorize the construction and operation of a forest resource processing facility.

Under Ontario Regulation 167/95 under the Crown Forest Sustainability Act, a type “C” licence is issued for a “sawmill” with the capacity to consume between 25 and 200 cubic metres per eight-hour shift.  Typical products include lumber, sawdust, bark, by-product chips, etc.  A forest resource processing facility licence may be issued for a term of up to five years.

Other information

Sturgeon Falls Brush and Contracting Limited has submitted a proposal to establish and operate a sawmill facility.  The facility is to be constructed on the company’s property located east of Sturgeon Falls, Ontario.  The proposal involves the construction and operation of a sawmill facility which will include equipment necessary for receiving fibre, debarking, sawing, planing, and chipping/creating shavings.  The new sawmill is intended to replace an existing smaller sawmill currently operating on the same property.  The company plans to maintain the existing sawmill which may operate intermittently, and it will also continue operating a fuelwood processor and cedar mulch business at the same site.

The proponent is proposing to consume private land and Crown forest resources. Harvesting of forest resources in a Crown forest will be conducted in accordance with approved Forest Management Plans.  Harvesting of trees reserved to the Crown on patented or privately-owned lands will be conducted in accordance with a licence to Harvest granted under Ontario Regulation 167/95.

The sawmill is expected to consume approximately 7,000 cubic metres of primarily poplar and hemlock forest resources annually.  Other species such as cedar, white birch, tolerant hardwood, red and white pine, and spruce-pine-fir may also be processed at the sawmill.

Products will include:

  • lumber for the building of swamp mats
  • skids used in utility construction projects
  • custom order rough and planed lumber
  • decking
  • dock and siding materials
  • fuelwood

The wood supply will be primarily sourced from land clearing projects undertaken by Sturgeon Falls Brush and Contracting Limited and via the purchase of open market fibre from local Crown forests such as the Nipissing Forest.  The sawmill will continue to employ five to seven staff and will operate year-round.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

MNRF - FID - Forest Industry Unit
Address

5520 Hwy 101 East, 2nd Floor
PO Bag 3020
South Porcupine, ON
P0N 1H0
Canada

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 15 août 2022
au 14 septembre 2022

Communiquer avec nous

Contact

Heather Farrer

Phone number
Office
MNRF - FID - Forest Industry Unit
Address

5520 Hwy 101 East, 2nd Floor
PO Bag 3020
South Porcupine, ON
P0N 1H0
Canada