Spirit Bay Harbour Inc. - Environmental Compliance Approval (waste)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (waste)

Numéro du REO
019-6312
Numéro de référence du ministère
8975-CJGRUA
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 23 novembre 2022 au 7 janvier 2023 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 23 novembre 2022
au 7 janvier 2023

Résumé de la décision

We issued an Environmental Compliance Approval to Spirit Bay Harbour Inc. for the use and operation of a transfer station for solid non-hazardous waste serving the marina and its clients.

Détails de l'emplacement

Adresse du site

1048 Cedar Beach Road
Bracebridge, ON
P1L 1W8
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Spirit Bay Harbour Inc.
49 Wellington Street East
Suite 100
Toronto, ON
M5E 1C9
Canada

Détails de la décision

We issued an Environmental Compliance Approval to Spirit Bay Harbour Inc. for the use and operation of a transfer station for solid non-hazardous waste serving the marina and its clients.

Approved waste types include solid non-hazardous waste, including domestic waste and recyclables from:

  • local residents
  • cottagers
  • the marina itself

Storage at the site will consist of covered leakproof drop-off bins, with maximum storage limited to 62 cubic metres (approximately 20 tonnes) on-site at any one time.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

No comments were received.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 4 avril 2023 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Mohsen Keyvani
Manager

Environmental Assessment and Permissions Branch
135 St Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

416-432-7253

Proponent(s)

Spirit Bay Harbour Inc.
49 Wellington Street East
Suite 100
Toronto, ON
M5E 1C9
Canada


Organe d’appel

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Inclure les éléments suivants:

Numéro du REO
019-6312
Numéro de référence du ministère
8975-CJGRUA

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-6312
Numéro de référence du ministère
8975-CJGRUA
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

23 novembre 2022 - 7 janvier 2023 (45 days)

Détails de la proposition

This proposal is for a new Environmental Compliance Approval (waste disposal site), to be issued to Spirit Bay Harbour Inc., located at 1048 Cedar Beach Road in the Town of Bracebridge, for the use and operation of a waste disposal site with a total site area of 0.472 hectares, to be used for processing solid non-hazardous waste including domestic bagged garbage and bagged recyclables, up to a maximum of 20 tonnes per day.

The total amount of waste stored at the site will not exceed 20 tonnes at any time.

The waste disposal site is to serve the patrons of Spirit Bay Harbour marina only. The hours of operation are from 8:00 a.m. to 5:00 p.m., Monday to Sunday.

Given the low volumes, impacts to the environment are not anticipated.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 23 novembre 2022
au 7 janvier 2023

Communiquer avec nous

Contact