Cette consultation a eu lieu :
du 19 décembre 2022
au 18 janvier 2023
Résumé de la décision
The variance is approved.
Détails de l'emplacement
Adresse du site
ESKER CAMP (APP. 523KM NE OF THUNDER BAY, 52.73906, -86.29195)
ON
Canada
Détails de l'emplacement du site
Bulk plant
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
RING OF FIRE METALS PTY LTD.
212 KING ST W, UNIT 501
TORONTO,
ON
M5H 1K5
Canada
Détails de la décision
- Use (an) unapproved:
- Collapsible fabric tanks: “Arctic King Series” – a total of three tanks, each with 76,000-litre capacity (one will contain jet fuel, which is not under TSSA’s jurisdiction) [contrary to Liquid Fuels Handling Code (LFHC) 1.3.1 & 3.1.1]
- Secondary containment liner: “Insta-Berm” (contrary to LFHC 1.3.1)
- Flexible hose: “New Line NL-3280 Low-Temp Artic Multi-Purpose” (contrary to LFHC 1.3.1)
- Containment sumps under dispenser - “Mini-Berms” trays or similar portable spill containment devices (contrary to LFHC 1.3.1 & 4.6.7)
- Dispenser pump (contrary to LFHC 1.3.1)
- Not to use an anti-siphon/automatic valve (contrary to LFHC 4.1.5)
- Use a flexible hose with a melting temperature less than 538 °C for an aboveground piping system (contrary to LFHC 4.4.1)
- Not to use a shear valve (contrary to LFHC 4.6.3)
Effets de la consultation
The comments were addressed by the RING OF FIRE METALS consulting engineer and taken in consideration by TSSA.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
345 Carlingview Drive
Toronto,
ON
M9W 6N9
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 2 février 2023 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
RING OF FIRE METALS PTY LTD.
212 KING ST W, UNIT 501
TORONTO,
ON
M5H 1K5
Canada
The Registrar
Divisional Court (Toronto Region)
130 Queen Street West
Osgoode Hall - Room 174
Toronto
M5H 2N5
Phone: (416) 327-5100
Fax: (416) 327-5549
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Marek Kulik
345 Carlingview Drive
Toronto,
ON
M9W 6N9
Canada
Proposition initiale
Détails de la proposition
- To use (an) unapproved:
- Collapsible fabric tanks: “Arctic King Series” – a total of three tanks, each with 76,000-litre capacity (one will contain jet fuel, which is not under TSSA’s jurisdiction) [contrary to Liquid Fuels Handling Code (LFHC) 1.3.1 & 3.1.1]
- Secondary containment liner: “Insta-Berm” (contrary to LFHC 1.3.1)
- Flexible hose: “New Line NL-3280 Low-Temp Artic Multi-Purpose” (contrary to LFHC 1.3.1)
- Containment sumps under dispenser - “Mini-Berms” trays or similar portable spill containment devices (contrary to LFHC 1.3.1 & 4.6.7)
- Dispenser pump (contrary to LFHC 1.3.1)
- Not to use an anti-siphon/automatic valve (contrary to LFHC 4.1.5)
- To use a flexible hose with a melting temperature less than 538 °C for an aboveground piping system (contrary to LFHC 4.4.1)
- Not to use a shear valve (contrary to LFHC 4.6.3)
Please note that the items numbered and lettered above, respectively, correspond to the items numbered and lettered under each subheading.
Proposal Details
LFHC Requirements that Would Not be Met:
1.3.1.
Equipment installed at a facility or on a highway tank shall be approved and installed in accordance with the requirements of this Code and the manufacturer’s instructions, and shall be appropriate for the service for which it is intended.
3.1.1.
Only aboveground storage tanks certified in accordance with an approved Standard shall be installed.
4.1.5.
Aboveground fuel storage tanks, including those located in dikes, require the following valve or valves, located as close to the tank as possible:
(a) where the fuel piping connection on the tank is located below the stored liquid level in the tank, a normally open, fire-safe valve that will automatically close when exposed to a fire condition; and
(b) where the fuel piping run extends below the stored liquid level in the tank, an anti-siphon valve or method that will automatically prevent siphoning of the fuel from the tank should a leak occur in the piping.
Note: A commonly used, acceptable method would be a normally closed solenoid valve that only opens when there is a demand for fuel flow in the pipeline.
4.4.1.
Aboveground piping and components shall be non-combustible and shall have a minimum melting temperature of 538 oC (1000oF).
4.6.3.
Where dispensing equipment is installed on an island or support structure, it shall be securely fastened, and an approved shear valve, installed in accordance with the manufacturer’s installation instructions, shall be installed beneath the dispensing equipment.
4.6.7.
Approved containment sumps shall be provided under the dispensers.
Why the Code Would Not be Met
This temporary fuel facility, which is only intended to operate for 10 years, is located on a rocky terrain where digging is not possible. Since this is a mining site, it requires specialized equipment.
-
- The location does not allow for the installation of approved steel tanks. Approved steel tanks must be installed on a level concrete pad, which is impossible in a remote area on a rocky, uneven terrain.
- An approved liner for this application does not exist due to a lack of certification services by Underwriters Laboratories of Canada (ULC).
- An approved hose for this application does not exist (the approved size is limited to 1 inch, while the required size is 1.5 inches).
- Approved containment sumps are not suitable for this application. The approved sumps are designed for permanent retail facilities and installed underground, which is not possible in this case.
- Approved dispenser pumps are not suitable for this application. The approved dispenser pumps are designed for permanent retail facilities where sumps are installed underground and attached to the dispenser on a concrete island, which is not possible in this case.
- Anti-siphon valves are designed to mount on the top of a rigid tank, but the facility will be using collapsible fabric tanks which are not compatible with anti-siphon valves.
- The rigid steel piping that meets the Code’s required melting temperature does not accommodate the movement of collapsible fabric tanks, which require flexibility and portability.
- Shear valve installation is designed for standard dispensers only. The dispensers at this gas station will not be standard and therefore will not be compatible with a shear valve.
Safety Assessment
-
- The tanks will be designed, constructed, and operated in accordance with the Canadian Standards Association (CAN/CSA) B837-14 “Collapsible Fabric Storage Tanks (Bladders)” standard.
- “Insta-Berm” secondary containment liners are compliant with the ULC-S668 standard.
- A professional engineer (P. Eng.) has stamped a letter stating that the proposed flexible hose is suitable for the intended application.
- The size and capacity of each “Mini-Berm” tray (or similar portable spill containment device) will be dependent on the location where it is deployed.
- Dispenser pump electrical equipment is CSA approved for hazardous locations (Class, Div I, Group D), and the wiring is in accordance with Section 18 of the Canadian Electrical Code (CEC) for hazardous locations.
- Monitoring procedures in the form of daily inspections will be performed to identify any leaks (e.g., breaks in the lines). Procedures will also be in place to ensure valves are locked when not in use.
- A Fire Safety Plan will be implemented to address fire prevention, evacuation, and emergency response. Emergency procedures outlined in O. Reg. 217/01 will be followed. Employees will be trained in emergency procedures, and all procedures will be documented and readily available in the fuel tank area and other identified locations within the camp.
- The dispensing hose will be fitted with a breakaway connector (used to prevent stretching or breaking), and the nozzles will be without trigger latches [nozzles without trigger latches require constant attendance (pressing release) so a spill is prevented].
In addition, to minimize or eliminate risks to employees and the natural environment, the following mitigations will be implemented on site:
-
- Fire resistant secondary containment
- Setback distances
- Fencing
- Reduced vehicular traffic
- Training
- Signage
- Fire suppression
TSSA assesses that there is likely to be no environmental impact should these variances be granted. TSSA has approved similar variances in the past (e.g., SR 1062934 & SR 1304264).
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
345 Carlingview Drive
Toronto,
ON
M9W 6N9
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 19 décembre 2022
au 18 janvier 2023
Communiquer avec nous
Contact
Marek Kulik
345 Carlingview Drive
Toronto,
ON
M9W 6N9
Canada
Commentaires reçus
Par l'entremise du registre
1Par courriel
0Par la poste
0