Dean-Lane Contractors Inc. - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-6447
Numéro de référence du ministère
5156-CLMCQC
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 26 janvier 2023 au 12 mars 2023 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 26 janvier 2023
au 12 mars 2023

Résumé de la décision

A new Environmental Compliance Approval was issued for the collection, transmission, treatment of stormwater run-off from a catchment area totalling 1.37 hectares of the Industrial Building Site.

Détails de l'emplacement

Adresse du site

15 McBrine Place
Kitchener, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Dean-Lane Contractors Inc.
15 McBrine Place
Kitchener, ON
N2R 1H5
Canada

Détails de la décision

Approval of works for the collection, transmission, treatment of stormwater run-off from a catchment area totalling 1.37 hectares of the Industrial Building Site, to provide enhanced water quality protection (i.e 80% TSS removal on a long-term basis) and to attenuate post-development peak flows to pre-development levels with a minimum 12.5 mm run-off to be retained, prior to discharge into the existing municipal storm sewer on Trillium Way, consisting of the:

  • rooftop storage
  • grassed/vegetated swale
  • one oil/grit separator and an existing pond retrofitted to be a wetland

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

No comments were received.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Guelph District Office
Address

1 Stone Road West
Floor 4
Guelph, ON
N1G 4Y2
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 17 mars 2023 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Fariha Pannu
Manager

Environmental Assessment and Permissions Branch
1st Floor, 135 St Clair Ave W
Toronto, ON
M4V 1P5
Canada

416-314-7092

Proponent(s)

Dean-Lane Contractors Inc.
15 McBrine Place
Kitchener, ON
N2R 1H5
Canada


Organe d’appel

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Inclure les éléments suivants:

Numéro du REO
019-6447
Numéro de référence du ministère
5156-CLMCQC

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-6447
Numéro de référence du ministère
5156-CLMCQC
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

26 janvier 2023 - 12 mars 2023 (45 days)

Détails de la proposition

This proposal is for a new Environmental Compliance Approval (industrial sewage) to be issued to Dean-Lane Contractors Inc. for the establishment of a stormwater management facility, as part of a proposed industrial building addition complete with asphalt parking and landscaped areas, for the collection, transmission, treatment and disposal of stormwater run-off generated from a site located at 15 McBrine Place in the City of Kitchener, Regional Municipality of Waterloo, Ontario.

The proposed stormwater management works will consist of an oil and grit separator designed to provide quality control prior to discharge from the site to the existing storm sewers on Trillium Drive, within the Grand River Watershed.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 26 janvier 2023
au 12 mars 2023

Communiquer avec nous

Contact