C. Villeneuve Construction Co. Ltd. - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
019-6511
Numéro de référence du ministère
6632-CN2JGW
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 17 janvier 2023 au 16 février 2023 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 17 janvier 2023
au 16 février 2023

Résumé de la proposition

This proposal is for the renewal of Permit to Take Water No. 5280-9LCNDD, issued to C. Villeneuve Construction Co. Ltd., for pit and quarry dewatering at the K Pit, located at Lot 22, Concession 5, Township of Casgrain, District of Cochrane, Ontario.

Détails de l'emplacement

Adresse du site

K-Pit
Lot 22, Concession 5
Casgrain, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

C. Villeneuve Construction Co. Ltd.
1533 Highway 11 West
Hearst, ON
P0L 1N0
Canada

Détails de la proposition

This proposal is for the renewal of Permit to Take Water No. 5280-9LCNDD, issued to C. Villeneuve Construction Co. Ltd., for pit and quarry dewatering at the K Pit, located at Lot 22, Concession 5, Township of Casgrain, District of Cochrane, Ontario. Details of the water taking are as follows:

Source name: K-pit pond (initial)

  • purpose category: pit and quarry dewatering
  • maximum rate per minute (litres per minute): 13,887
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres per day): 20,000,000
  • maximum number of days of taking per year: 60
  • duration: April 1 to November 30 for 10 years

Source name: K-pit pond (maintenance)

  • purpose category: pit and quarry dewatering
  • maximum rate per minute (litres per minute): 7,683
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres per day): 11,000,000
  • maximum number of days of taking per year: 180
  • duration: April 1 to November 30 for 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 1 permit.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 17 janvier 2023
au 16 février 2023

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis