Commentaire
I am a resident of Prince Edward County. While I support researching/utilizing alternative energy sources, the way in which White Pines conducted their business in The County is/was totally unacceptable. They cleared the land prior to construction without full or proper approvals, and then proceeded to build the windmills also without full or proper approvals.
This area is totally inappropriate to windmill construction due to environmental studies on both wildlife and the geophysical situation.
Please ensure that the windmills are dismantled as soon as possible !
Soumis le 12 novembre 2018 11:00 AM
Commentaire sur
Nouveau règlement pris en application de la Loi sur la protection de l’environnement pour fermer le projet de parc éolien White Pines
Numéro du REO
013-3835
Identifiant (ID) du commentaire
11599
Commentaire fait au nom
Statut du commentaire