Commentaire
It is shocking that there is a suggestion to remove the bike lanes that used a lot of materials and energy to build so soon after their construction. If the government believes the routes are not used enough to offset the small space they take up, I would like a study on the traffic conditions to be done. If in a couple years the streets need to be repaired then I would welcome an upgrade to the road that is backed by this traffic study. It does not make sense to say the project failed so soon after it's completion. There was still construction on parts of my route less than 3 months ago. (Bloor and St.George protected intersection)
These bike lanes remove gasoline guzzling cars from the road. I personally bought my bike and accessories second hand and therefore nothing new needed to be produced and no carbon emissions were created from my choice. This allows a clean source of transportation to be used around the city.
Soumis le 19 novembre 2024 8:56 PM
Commentaire sur
Projets de loi 212 – Loi de 2024 sur le désengorgement du réseau routier et le gain de temps - Cadre en matière de pistes cyclables nécessitant le retrait d’une voie de circulation.
Numéro du REO
019-9266
Identifiant (ID) du commentaire
118858
Commentaire fait au nom
Statut du commentaire