Comment ID: 210833 I…

Numéro du REO

013-1043

Identifiant (ID) du commentaire

31419

Commentaire fait au nom

Individual

Statut du commentaire

Commentaire

Comment ID: 210833

I believe before the construction of the wind turbines in my area , a base line of the wells in this area should be established by the company before construction. I have this concern because of the public out cry of the damage done in the Dover area. The dover bed rock is the same as in my area and my well has been clear and with no contamination sense 1979 when I purchased the property . The well casing was upgraded in 2002 to 5'' pipe by Wade Well Drilling and tested for water quality and volume flow .This well has been a strong well for years with a strong water flow . I have ran this well for 8 hrs. constantly to test it for volume when the well was upgraded in 2002 and the flow never stopped in flow rate or clarity .This well provided fresh water for my family sense 1979 when I purchased the property.