Commentaire
1. Is there any type of exemption for organic soils or topsoil, including, characterization frequency requirements.
2. Can "liquid soils" be drained actively or through amendments provided that they are eventually transported to an MECP approved facility as "waste?"
3. How long will the transitional period be, where ongoing projects will be exempted from the regulatory requirements?
4. When is the new regulation and the amendments to O.Reg.153/04 expected to be adopted as new regulation?
Soumis le 14 juin 2019 10:09 AM
Commentaire sur
Projet de Règlement sur la Terre d’Excavation et Modifications du Règlement sur les Dossiers de l’état des Sites (Friches Industrielles)
Numéro du REO
013-5000
Identifiant (ID) du commentaire
32186
Commentaire fait au nom
Statut du commentaire