C. VILLENEUVE CONSTRUCTION CO. LTD. - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
019-8247
Numéro de référence du ministère
1000252224
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 8 février 2024 au 24 mars 2024 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 8 février 2024
au 24 mars 2024

Résumé de la décision

An Environmental Compliance Approval with Limited Operational Flexibility (air) has been issued to C. VILLENEUVE CONSTRUCTION CO. LTD. This approval is for the operation of a hot mix asphalt plant, located on Highway 11 approximately 10 kilometres northwest of Kapuskasing, Ontario.

Détails de l'emplacement

Adresse du site

Val Rita Quarry
Val Rita-Harty, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

C. VILLENEUVE CONSTRUCTION CO. LTD.
P.O. Box 1720
Hearst, ON
P0L1N0
Canada

Détails de la décision

An Environmental Compliance Approval with Limited Operational Flexibility (air) has been issued to C. VILLENEUVE CONSTRUCTION CO. LTD. This Approval replaces all the current Environmental Compliance Approvals for air at this facility and includes the addition of new or historically unapproved sources for all emissions from C. VILLENEUVE CONSTRUCTION CO. LTD., an asphalt plant, located on Highway 11 approximately 10 kilometres northwest of Kapuskasing, Ontario.

The approval includes all sources at the facility, including:

  • cold feed bins with conveyors for raw material loading;
  • reclaimed asphalt pavement (RAP) bin and RAP conveyor for optional raw material loading;
  • drum mixer with burner (diesel or natural gas) and associated baghouse; baghouse dust trailer (enclosed);
  • asphalt cement (AC) tank(s) and associated heater(s) (diesel or natural gas);
  • hot mix asphalt (HMA) conveyor and associated HMA silo for product load-out; and
  • two diesel generators (i.e., day generator and night generator)

The main emissions to the air from this facility include:

  • nitrogen oxides,
  • sulphur dioxide,
  • carbon monoxide,
  • acetone,
  • amylene,
  • benzene,
  • benzo(a)pyrene, and
  • butane

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

No comments were received.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 31 octobre 2024 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Nancy Orpana
Manager, Air Approvals

Environmental Permissions Branch
135 St. Clair Avenue West
Toronto, ON
M4V 1P5
Canada

(613) 484-2675

Proponent(s)

C. VILLENEUVE CONSTRUCTION CO. LTD.
P.O. Box 1720
Hearst, ON
P0L1N0
Canada


Organe d’appel

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Inclure les éléments suivants:

Numéro du REO
019-8247
Numéro de référence du ministère
1000252224

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-8247
Numéro de référence du ministère
1000252224
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

8 février 2024 - 24 mars 2024 (45 days)

Détails de la proposition

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for air at this facility and includes the addition of new or historically unapproved sources for all emissions from C. VILLENEUVE CONSTRUCTION CO. LTD., an asphalt plant, located on Highway 11 approximately 10 kilometres northwest of Kapuskasing, Ontario.

The application includes all sources at the facility, including:

  • cold feed bins with conveyors for raw material loading
  • reclaimed asphalt pavement (RAP) bin and RAP conveyor for optional raw material loading
  • drum mixer with burner and associated baghouse
  • baghouse dust trailer
  • asphalt cement (AC) tank(s) and associated heater(s)
  • hot mix asphalt (HMA) conveyor and associated HMA silo for product load-out; and
  • two diesel generators

Emissions to the air from this facility, include:

  • nitrogen oxides
  • sulphur dioxide
  • carbon monoxide
  • acetone
  • benzene
  • benzo(a)pyrene
  • butane, and
  • carbon dioxide

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 8 février 2024
au 24 mars 2024

Communiquer avec nous

Contact