Fowler Construction Company Limited - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
019-9260
Numéro de référence du ministère
4060-D9PJMY
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 11 octobre 2024 au 10 novembre 2024 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 11 octobre 2024
au 10 novembre 2024

Résumé de la proposition

This proposal is for the renewal of Permit to Take Water No. 8275-B9YS6T for Fowler Construction Company Limited. Water will be taken for construction dewatering purposes at the Fleming Quarry, located at 3230 Switch Road in Washago, Ontario.

Détails de l'emplacement

Adresse du site

3230 Switch Road
Part of Lots 38 and 39 Concession Front Range
Washago, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Fowler Construction Company Limited
1206 Rosewarne Drive
Post Office Box 630
Bracebridge, ON
P1L 1T9
Canada

Détails de la proposition

This proposal is for the renewal of Permit to Take Water No. 8275-B9YS6T for Fowler Construction Company Limited. Water will be taken for construction and dewatering purposes at the Fleming Quarry, located at 3230 Switch Road in Washago, Ontario. Details of the water taking are as follows of:

Source Name: Quarry Pond A

  • purpose: dewatering
  • maximum rate per minute (litres per minute): 900
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 1,296,000
  • maximum number of days of taking per year: 240
  • period of taking: January 1 to December 31 for 10 years

Source Name: Quarry Pond B

  • purpose: construction - road building
  • maximum rate per minute (litres per minute): 200
  • maximum number of hours of taking per day: 12
  • maximum volume per day (litres): 144,000
  • maximum number of days of taking per year: 210
  • period of taking: January 1 to December 31 for 10 years

Source Name: East Pond

  • purpose: dewatering
  • maximum rate per minute (litres per minute): 900
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 1,296,000
  • maximum number of days of taking per year: 183
  • period of taking: January 1 to December 31 for 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 3 permit.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 11 octobre 2024
au 10 novembre 2024

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis