Cette consultation a eu lieu :
du 27 janvier 2025
au 26 février 2025
Résumé de la décision
Pursuant to Section 53 of the Planning Act, the Minister of Municipal Affairs and Housing gave provisional consent to Application number 54-C-189896 in respect to land in Tudhope Unincorporated Township on June 11, 2025, subject to conditions. The last day this decision can be appealed is July 31, 2025.
Détails de l'emplacement
Adresse du site
PIN 61301-0066
Tudhope ,
ON
Canada
Détails de l'emplacement du site
PIN 61301-0066, Lot 11, Concession 1, Tudhope Unincorporated Township, Timiskaming District
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Olive Westbrook
48 Forth Ave
Englehart ,
ON
P0J1H0
Canada
Détails de la décision
Application 54-C-189896 was approved on June 11, 2025, with conditions. This approval will allow the transfer of a lot approximately 1.6 hectares in size and irregular in shape, with 38 metres of water frontage, 121 metres of highway frontage and a depth of approximately 240 metres. The severed lot is currently vacant with a seasonal dwelling proposed. The land will be used for resource-based recreational purposes. Access will be from the existing entrance from Highway 65.
The proposed retained lot would be approximately 3 hectares in size, irregular in shape, with 163 metres of water frontage, 223 metres of highway frontage, and a depth of approximately 210 metres. The proposed retained land contains a seasonal dwelling, 3 small ‘cabins’ and is currently used for resource-based recreational purposes. The retained land is proposed to be accessed through a new entrance from Highway 65.
The application was reviewed for consistency with the environmental policies of the Provincial Planning Statement (e.g. natural heritage, water quality protection). No public comments were received, or concerns identified. The decision to approve the consent is consistent with the Provincial Planning Statement and will not have a significant impact on the environment.
The approval can be appealed by a specified person or public body, as defined in s. 1(1) of the Planning Act, using the procedure outlined below. Notice to appeal the decision to the Ontario Land Tribunal must be filed with the Minister of Municipal Affairs and Housing on or before July 31, 2025. The applicant has two (2) years to satisfy conditions, otherwise the approval will lapse. Non-standard conditions include:
1. That prior to final approval, and pursuant to subsections 53(12) and 51(25) and 51(26) or (27) of the Planning Act, the applicant shall enter into a Consent Agreement with the Ministry of Municipal Affairs and Housing, to its satisfaction, for each of the severed and retained lots, addressing their use and potential development, including:
a. the new lot can only be used for resource-based recreational uses (including a recreational dwelling) and is not to be used for permanent
residential or commercial uses.
b. the retained lot can only be used for resource-based recreational uses (including a recreational dwelling) and is not to be used for permanent residential or commercial uses.
c. provisions to obtain undertakings from the applicant and/or the applicant’s lawyer to implement conditions and requirements, including that the Consent Agreement be registered on title in priority to other documents; and,
d. provisions relating to the enforcement of the Consent Agreement.
2. That prior to final approval, the Ministry must be provided with written confirmation from Ministry of Transportation (MTO) showing that applications for entrance permits for the severed and retained lots, signed by the transferees of the severed and retained lot have been submitted and that the MTO is willing to approve the applications.
3. That prior to final approval, the Ministry must be provided written confirmation of adequate capacity to dispose of hauled sewage generated by the proposed new lots. This written confirmation should take the form of a letter from the holder of an Environmental Compliance Approval (ECA) for an approved septage disposal facility, confirming it has sufficient reserve capacity to accept any additional hauled sewage from this lot.
4. That prior to final approval, the Ministry must be provided with a letter from the waste disposal site confirming that it is licensed to accept solid waste and is willing to accept solid waste from each of the proposed severed and retained lots.
5. That prior to final approval, confirmation must be provided that the archaeological assessment has been reviewed and accepted by the Ministry of Citizenship and Multiculturalism (MCM), and that no further assessment is required.
6. That prior to final approval, the Ministry must be provided with written confirmation from the Timiskaming Health Unit indicating that both proposed severed and retained lands could accommodate a properly functioning septic system and leaching bed, and that any existing systems are functioning satisfactorily/had been inspected.
Effets de la consultation
As a result of public consultation on this consent application, the Ministry received no comments through the Environmental Registry of Ontario, and no additional comments through email to Ministry staff.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
159 Cedar Street
Suite 401
Sudbury,
ON
P3E 6A5
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 20 jours à partir du 11 juillet 2025 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
This instrument decision can be appealed under the Planning Act and the Environmental Bill of Rights.
Start the process to appeal
Appeal Rights under the Planning Act
You can appeal all or part of this instrument to the appeal to the Ontario Land Tribunal (OLT) by submitting a notice of appeal to the Minister of Municipal Affairs and Housing. You have 20 days to begin the appeal process.
Who can appeal
Other than the applicant, only a "specified person" or "public body", as defined in s. 1(1) of the Planning Act, has the ability to appeal the decision to the Ontario Land Tribunal.
Notice of appeal
Your notice of appeal must include:
- the reasons for your appeal
- the appeal fee, payable by certified cheque or money order to the Minister of Finance, Province of Ontario
Note: appeal fees and options for reductions are outlined in the Ontario Land Tribunal's fee chart
Mail your notice of appeal
Send your notice of appeal to the Minister of Municipal Affairs and Housing via the ‘issuing authority’ contact listed below.
AND
Send a copy of your notice of appeal to the Minister of Environment, Conservation and Parks. You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park
5th Floor, 777 Bay Street
Toronto, ON
M7A 2J3
Olive Westbrook
48 Forth Ave
Englehart ,
ON
P0J1H0
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
About the Ontario Land Tribunal
There is an additional “leave to appeal” right under the Environmental Bill of Rights. This appeal must be commenced within 15 days of the notice of decision being posted on the Environmental Registry (ero.ontario.ca). For more information about this appeal method, refer to the Environmental Bill of Rights, 1993, or https://www.ontario.ca/page/environmental-bill-rights.
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Zeinab Seifpour
159 Cedar Street
Suite 401
Sudbury,
ON
P3E 6A5
Canada
Proposition initiale
Détails de la proposition
The application would create one new lot, on the Montreal River for resource-based recreational purposes. The proposed severed lot would be approximately 1.6 hectares with 38 metres of water frontage and 121 metres of frontage on Highway 65. The land is currently vacant with a seasonal dwelling proposed. Access will be from the existing entrance from Highway 65.
The proposed retained lot would be approximately 3 hectares in size, irregular in shape, with 163 metres of water frontage and 223 metres of frontage on Highway 65. It contains a seasonal dwelling, 3 small ‘cabins’ and is currently used for resource-based recreational purposes. It is proposed to be accessed through a new entrance from Highway 65.
No new buildings or structures are proposed as a result of this application.
The application will be reviewed for consistency with the environmental policies of the Provincial Policy Statement (e.g. natural heritage, water quality protection). Public comments received or concerns identified will be considered in the review to determine whether the application is consistent with the Provincial Policy Statement and whether it would have any significant impact on the environment. If you have any questions, or would like to submit comments, please do so either online (below), by letter or phone to the contact person listed. Please submit your comment during the 30-day public consultation period and reference the Environmental Registry Number # 025-0123.
Your personal information may be used in the decision-making process on this proposal, and it may be used to contact you if clarification of your comment is required. It may be shared (along with your comment) with other Ontario ministries for use in the decision-making process. Questions about this collection should be directed to the contact listed.
If a person or public body that wishes to file an appeal in respect of the proposed consent does not submit written comments to the Minister before the Minister gives or refuses to give a provisional consent (e.g., during the public consultation period), the Ontario Land Tribunal may dismiss the appeal. Appeal of a decision of the Minister in respect of this consent may be made by any person or public body not later than 20 days after notice of the decision is given. If you wish to be notified of the decision of the Minister in respect of the proposed consent, you must make a written request to the Minister at the contact address.
As required under the Planning Act, a public notice for the application will also be posted in the local newspaper in English and French.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
159 Cedar Street
Suite 401
Sudbury,
ON
P3E 6A5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 27 janvier 2025
au 26 février 2025
Communiquer avec nous
Contact
Zeinab Seifpour
159 Cedar Street
Suite 401
Sudbury,
ON
P3E 6A5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0