Cette consultation a eu lieu :
du 8 septembre 2025
au 8 octobre 2025
Résumé de la proposition
This proposal is for a new Permit to Take Water for Driftwood Quarry, west of Cochrane for C. VILLENEUVE CONSTRUCTION CO. LTD. Water will be taken from Driftwood quarry for dewatering purposes to maintain dry conditions.
Détails de l'emplacement
Adresse du site
Lot 9 Concession 5 Geographic Township of Calder
District of Cochrane,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
C. VILLENEUVE CONSTRUCTION CO. LTD.
1533 HIGHWAY 11
HEARST,
ON
P0L 1N0
Canada
Détails de la proposition
This proposal is for a Permit to Take Water for Driftwood Quarry, west of Cochrane. Water will be taken from Driftwood quarry for dewatering purposes to maintain dry conditions. Details of the water taking are as follows:
Permit type – new
Source name: Driftwood Quarry
- purpose: initial quarry dewatering
- maximum rate per minute (litres): 18,750
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 27,000,000
- maximum number of days of taking per year: 60
- earliest calendar date of taking (mm/dd): January 1st
- latest calendar date of taking (mm/dd): December 31st
- period of taking: 10 years
Purpose: Maintenance Quarry Dewatering
- maximum rate per minute (litres): 1,994
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 2872000
- maximum number of days of taking per year: 305
- earliest calendar date of taking (mm/dd): January 1st
- latest calendar date of taking (mm/dd): December 31st
- period of taking: 10 years
There are three categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 8 septembre 2025
au 8 octobre 2025