Cette consultation se termine à 23 h 59 le :
24 janvier 2026
Résumé de la proposition
This proposal is to amend the existing Environmental Compliance Approval (ECA) no. 1590-DF6K89, issued to Silver Lake Ontario Inc. (SLO) for the Sugar Zone Mine, located approximately 35 kilometres north of White River, Ontario. The present amendment is required to support ongoing operations and includes several key modifications.
Détails de l'emplacement
Adresse du site
Within the Townships of Odlum, Strickland, Gourlay, Tedder, and Unorganized Township of Hambleton,
Townships of Odlum,
ON
P0M 3G0
Canada
Détails de l'emplacement du site
Sugar Zone Project
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Silver Lake Ontario Inc.
113 Tukanee Lake Road
White River,
ON
P0M 3G0
Canada
Détails de la proposition
This proposal is to amend the existing Environmental Compliance Approval (ECA) no. 1590-DF6K89, issued to Silver Lake Ontario Inc. (SLO) for the Sugar Zone Mine, located approximately 35 kilometres north of White River, Ontario.
This ECA was granted to oversee the collection, transmission, treatment, and disposal of a maximum daily flow of 2,100 cubic metres of mine water and the provision for Limited Operational Flexibility.
The present amendment is required to support ongoing operations and includes several key modifications. The central component of this proposal is the construction of a new South Tailings Management Facility (STMF), which is a secure facility for storing milled rock by-products (tailings) and includes associated water diversion channels. This new facility requires the installation of new overland piping to transport tailings, reclaim water, and seepage water.
For effective site water management, especially during Spring melt and heavy rainfall, this application also seeks to increase the maximum permitted daily discharge rate of treated water to Gagegenha Lake from 2,100 cubic meters per day to 2,600 cubic meters per day.
Finally, the amendment proposes modifications to the allowable monthly average effluent limits for some parameters, based on updated environmental studies reviewed by the Ministry, to ensure the continued protection of the local environment.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada