Résumé de la proposition
Reach Harbour Marina wants to continue to use two single-wall steel underground storage tanks, located approximately one metre from Lower Buckhorn Lake, for two more years during the “on-season” (approximately May to October), and then remove them from the ground.
Détails de l'emplacement
Adresse du site
2360 ARMSTRONG LANE E; RR 1
LAKEFIELD,
ON
K0L 2H0
Canada
Détails de l'emplacement du site
marina
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
REACH HARBOUR MARINA INC
2360 ARMSTRONG LANE E; RR 1;
LAKEFIELD,
ON
K0L 2H0
Canada
Détails de la proposition
Clause 5.5.1 of the Liquid Fuels Handling Code (LFHC) 2017 requires tanks to be installed five metres from a lake.
Reach Harbour Marina is not currently operating because the “on-season” starts in May. The two tanks have been shut down since the end of the 2019 season, in accordance with LFHC clause 2.4.1.1 for temporary disuse.
In addition, marinas are not an essential service under the Government’s COVID-19 safety directives. Projecting a loss of revenue for 2020, due to the current COVID-19 conditions, Reach Harbour Marina is not in the financial position to remove the tanks right now.
To support its request to continue using the tanks, Reach Harbour Marina will obtain a quote to remove the tanks and forward it to the Technical Standards and Safety Authority (TSSA) Fuels Safety Program during the off-season of 2020. Note that this will only be possible once the Government’s COVID-19 safety directives for non-essential businesses have been lifted.
Reach Harbour intends to have the tanks removed during the off-season of 2021, provided COVID-19 safety directives for non-essential businesses have been lifted.
In the interim, the Reach Harbour Marina will continue to monitor the tanks for leaks, in accordance with LFHC code 5.5.1, which states the for requirement for “daily monitoring during use, as well as precision leak test every two years, and Cathodic Protection test every two years.”
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 29 avril 2020
au 29 mai 2020