Meridian Brick Canada Ltd./Briques Meridian Canada Ltee - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
019-5262
Numéro de référence du ministère
6855-CCLRYW
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 23 mars 2022 au 22 avril 2022 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 23 mars 2022
au 22 avril 2022

Résumé de la décision

This decision is to renew Permit to Take Water No. 0317-BJHRDA for Meridian Brick Canada Ltd./Briques Meridian Canada Ltee. Water will be taken from one watercourse intake for industrial purposes, located in the City of Burlington, Ontario.

Détails de l'emplacement

Adresse du site

5155 Dundas Street West
Lot 3 Concession 1 North of Dundas Street
Burlington, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Meridian Brick Canada Ltd./Briques Meridian Canada Ltee
5155 Dundas Street
P.O Box 248
Burlington, ON
L7R 3Y2
Canada

Détails de la décision

This decision is to renew Permit to Take Water No. 0317-BJHRDA for Meridian Brick Canada Ltd./Briques Meridian Canada Ltee. Water will be taken from one watercourse intake for industrial purposes, located in the City of Burlington, Ontario. Permit to Take Water No. 5005-CEWKJR was issued on June 2, 2022 for a period of 10 years. Details of the water taking are as follows:

Source name: Black River

  • purpose of taking: manufacturing industrial purposes
  • maximum rate per minute (litres): 700
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 1,008,000
  • maximum number of days of taking per year: 365
  • period of taking: January 1 to December 31 for 10 years

Request a copy of the permit.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

1

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

One comment was received via email identifying concerns with this Permit to Take Water (PTTW) proposal. The main concerns raised were regarding the following:

  • concerns with the quality of water returned to Bronte Creek
  • entrainment of fish and aquatic habitat
  • potential effects on the population of Silver Shiner in Bronte Creek which are classified as threatened

It was recommended that this proposal be subjected to the Ontario’s Endangered Species Act screening process.

Comments relevant to the water taking proposal were considered as part of the review of this proposal. The MECP regulates long term discharge of water through the issuance of an Environmental Compliance Approval. Environmental Compliance Approvals are issued following extensive review of the water management plans by ministry science experts and engineers, and include conditions for monitoring and regularly assessing the efficiency of the operation. Conditions 2.2.1 and 5.5 have also been included in the PTTW to address the first comment. The second comment has been addressed through condition 5.4 in the PTTW. Regarding the third comment, we have notified the proponent to contact Species at risk in Ontario (SAROntario@ontario.ca) to determine the Endangered Species Act screening process.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 7 juin 2022 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.

Appeal process for decisions published before June 1, 2021

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON 
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Dan Hughes
Environmental Scientist

Permit to Take Water Unit
135 St Clair Ave W
Toronto, ON
M4V 1P5
Canada

226-964-1812

Proponent(s)

Meridian Brick Canada Ltd./Briques Meridian Canada Ltee
5155 Dundas Street
P.O Box 248
Burlington, ON
L7R 3Y2
Canada


Organe d’appel

Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Environmental Review Tribunal


Inclure les éléments suivants:

Numéro du REO
019-5262
Numéro de référence du ministère
6855-CCLRYW

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-5262
Numéro de référence du ministère
6855-CCLRYW
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

23 mars 2022 - 22 avril 2022 (30 days)

Détails de la proposition

This proposal is to renew Permit to Take Water No. 0317-BJHRDA for Meridian Brick Canada Ltd./Briques Meridian Canada Ltee. Water will be taken from one watercourse intake for industrial purposes, located in the City of Burlington, Ontario. Details of the water taking are as follows:

Source name: Black River

  • purpose of taking: manufacturing industrial purposes
  • maximum rate per minute (litres): 700
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 1,008,000
  • maximum number of days of taking per year: 365
  • period of taking: January 1 to December 31 for 10 years

More about Permits to Take Water

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 23 mars 2022
au 22 avril 2022

Communiquer avec nous

Contact