September 18, 2024 - October 18, 2024 (30 days) Closed
Last updated
This decision grants a new Environmental Compliance Approval for the construction and operation of subsurface sewage disposal works with a rated capacity of 113,850 litres per day. The system will service residences, campgrounds, and a trailer park located at 1780 County Road 92 in the Town of Springwater.
August 14, 2024 - September 28, 2024 (45 days) Closed
Last updated
Approval is granted for a new Environmental Compliance Approval for 1000518153 Ontario Inc. for industrial stormwater management works to serve a proposed storage yard, located at 167 Yates Avenue in Sault Ste. Marie, Ontario.
The Permit to Take Water No. 1827-DN7PDT was issued to Glencore Canada Corporation on November 26, 2025, to renew the Permit No. 3051-A4EMCQ. Water will be taken from one well for the purpose of mine dewatering at Fraser Mine, located in Sudbury, Ontario.
October 9, 2025 - November 23, 2025 (45 days) Closed
Last updated
Establishment of industrial stormwater management Works to serve waste and recycling transfer station and excess soil facility, located in the City of Toronto for the collection, transmission, treatment and disposal of stormwater run-off from a total catchment area of 3.24 hectares of total 6.35 hectares of site.
The approval is for a new Environmental Compliance Approval for industrial stormwater management works serving 2706684 Ontario Inc., located at 20 Blessington Road, in the City of Belleville.
September 12, 2025 - October 12, 2025 (30 days) Closed
Last updated
The Permit to Take Water No. 3557-DNV5UF was issued to 2543174 Ontario Ltd. on December 1, 2025, to renew the Permit No. 5651-C8UMSW-INTERIM. Water will be taken from one pond for the purposes of snowmaking at Mount Baldy Ski Area, located in Shuniah, Ontario.
This approval is granted for Stonetown Foods to amend the Environmental Compliance Approval (ECA) No. 8151-5CLKD3 for approval of sewage works to serve food processing facilities located at 1865 Perth Road 139 in St Marys, Ontario.
December 1, 2025 - January 15, 2026 (45 days) Closed
Last updated
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 2339-7PSS97 for 2629045 Ontario Limited, a ready-mix concrete batching facility, located in the City of Windsor, Ontario.
December 1, 2025 - January 15, 2026 (45 days) Closed
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for all emissions from Dajcor Aluminum Ltd., producing extruded fabricated and anodized components and assemblies, located in the Municipality of Chatham-Kent, Ontario.
December 1, 2025 - January 15, 2026 (45 days) Closed
Last updated
This proposal is for a new Environmental Compliance Approval (air & noise) for Beyond Pet and Equine Cremation Inc., an animal cremation facility, located in the Township of Blandford-Blenheim, Ontario.
July 31, 2024 - September 14, 2024 (45 days) Closed
Last updated
An approval was granted to Camp Crossroads to amend Environmental Compliance Approval No. 5723-6RZPZZ for the year-round sewage treatment and subsurface disposal works rated at 52,500 litres per day, serving a recreational camp facility located at 1224 East Bay Road, in Torrance, Township of Muskoka Lakes, Municipality of Muskoka.
The ministry has issued a new Environmental Compliance Approval (industrial sewage works) for the installation of a new water management system aimed at collecting and reusing surface water and process water serving the St. Mary Cement Building Material (CBM) Windsor facility, located at 3510 Russell Street, Windsor, Ontario.
The minister has approved amendments to Volume III of the Thames-Sydenham and Region Source Protection Plan and associated Assessment Reports to add protections to the backup intake of the Lambton Area Water Supply drinking water system and to align the plan policies with the 2021 technical rules under the Clean Water Act, 2006.
The Director of Exploration has made a decision on the exploration permit application PR-25-000027 to Thunder Gold Corp. & Rift Minerals Inc. for early exploration activities.
The decision is to: issue the mineral exploration permit.
November 28, 2025 - December 28, 2025 (30 days) Closed
Last updated
The Minister of Municipal Affairs and Housing has received requests from the owners of property at 636 Bay St., 70 and 100 Edward St. to amend Map No. 345 to Minister’s Zoning Order, Ontario Regulation 10/24, that applies to lands in the City of Toronto.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-9117
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
September 5, 2024 - October 7, 2024 (32 days) Closed
Last updated
Approval was granted for a site plan amendment to allow R.W. Tomlinson Limited to change the final rehabilitation from a pond to a filled-to-grade landform, allowing for the importation of excess soils in the City of Ottawa.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-7540
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
August 29, 2023 - October 30, 2023 (62 days) Closed
Last updated
Approval was granted for a site plan amendment to Lafarge Canada Inc. to amend the current site plan to allow additional extraction to occur below the groundwater table.
The Ministry has received a request for conditional filing. A conditional filing order allows a proponent to submit a closure plan or closure plan amendment that does not meet all statutory requirements at the time of submission.
October 16, 2025 - November 15, 2025 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-25-000185 to New Age Metals Inc., for early exploration activities.
The decision is to: issue the mineral exploration permit.