Pomas Farms Inc.- Environmental Compliance Approval (sewage)

ERO number
019-2241
Notice type
Bulletin
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Bulletin posted
Last updated

This notice is for informational purposes only. There is no requirement to consult on this initiative on the Environmental Registry of Ontario. Learn more about the types of notices on the registry.

Bulletin summary

An amendment to Environmental Compliance Approval is granted to Pomas Farms Inc. for sewage works expansion (increase rated capacity from 40,000 L/day to 96,000 L/day) to service a new bunkhouse and two existing bunkhouses, located at 1057 Highway 77, in the Municipality of Leamington.

Why consultation isn't required

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempted all proposals for policies, acts, regulations and instruments from posting requirements under the EBR.

Ontario Regulation 115/20 was revoked on June 15, 2020, however, we are posting this decision as a bulletin because the proposal was posted on April 22, 2020 while Ontario Regulation 115/20 was in effect.

Although consultation was not required, the ministry did consult with the public on this proposal by posting ERO# 019-1678 for public comment from April 22, 2020. To ensure transparency, the ministry is providing details of its decision and the effects of consultation on decision-making in this notice.

Bulletin details

Proponent(s)

Pomas Farms Inc.
1057 Highway 77
Leamington, ON
N0P 2J0
Canada

Location details

1057 Highway 77
Leamington, ON
N0P 2J0
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Instrument decision details

An amendment to Environmental Compliance Approval is granted to Pomas Farms Inc. for sewage works expansion (increase rated capacity from 40,000 L/day to 96,000 L/day) to service a new bunkhouse and two existing bunkhouses for accommodating a total of 320 on-site workers, other 144 employees at greenhouse and warehouse facilities, as well as 13 loading docks, located at 1057 Highway 77, in the Municipality of Leamington.

The remaining existing sewage works include Phases 1&2 sewage grease interceptor, septic tank and Waterloo Biofilter treatment unit as new pre-treatment measure, and Phases 3~5 grease interceptors, septic tanks and balancing tank.

The new works includes two grease interceptors, one (1) 60,000 L equalization tank/pump station PS1, one primary sedimentation tank comprised of four (4) tanks (retrofitted from existing Biofilter 31,800 L (each) tanks), two Moving Bed Biofilm Reactor (MBBR) reactors with chemical dosing system, one final clarifier, one roller cloth filer system, and one UV disinfection system. The final effluent will be discharged into West Branch of Reid Drain.

Comments received

  • 0 received through the registry
  • 0 received by mail
  • 0 received by email

Effects of consultation

Third parties are not able to apply for leave to appeal in respect of proposals which are posted while Ontario Regulation 115/20 is in effect. On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak which exempts all proposals from the requirement to post notices on the ERO. Leave to appeal may only be sought in respect of instruments that are required to be posted to the ERO.

Appeal information

This instrument type cannot be appealed.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.