January 21, 2026 - February 20, 2026 (30 days) Closed
Last updated
An approval has been granted to Grace Family Farms Ltd. to amend Environmental Compliance Approval No. 6497-CJ7QND for the proposed expansion of the existing stormwater management pond to accommodate the Phase 2 greenhouse expansion at 219 County Road 18 in the Municipality of Leamington.
We have decided to permit Oxford County to implement a new combined heat and power system at the existing Woodstock Wastewater Treatment Plant so it can generate electricity and heat using biogas already produced on-site. The project will fit within the current facility footprint, with no changes to operations and new buildings required.
An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) has been granted to Minth Canada Holding Inc., an electric vehicle battery casing manufacturing facility, using raw materials such as aluminum billets, power paint coatings and aluminum connectors, located in the City of Windsor Ontario.
Instrument type:
Order to prevent discharge of contaminants
ERO number
026-0079
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
January 22, 2026 - March 8, 2026 (45 days) Closed
Last updated
A director's order was issued to Catharine Kench, Michael Kench, Roger Tregunna, and Resaca Homes Ltd. requiring the delineation and development of a plan to address contamination originating from 745 King Street West, Gananoque.
An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) was granted to Owens Corning Insulating Systems Canada GP Inc., for its Scarborough site located at the 3450 McNicoll Avenue, Toronto, Ontario.
The facility production limit is 240 tonnes of bare molten glass per day.
An Environmental Compliance Approval (air & noise) has been granted to The Sarjeant Company Limited, for its ready-mix concrete batching facility located in Parry Sound, Ontario.
This application is for the operation of, four dust collectors, one boiler, aggregate stockpiles, and ancillary equipment.
January 20, 2026 - February 19, 2026 (30 days) Closed
Last updated
Permit to Take Water No. P-300-2405504189 version 1.0 was issued to 2141632 Ontario Inc. on June 5, 2026, to renew Permit to Take Water No. 7074-BXWSLB for golf course irrigation purposes. Water will be taken from one well and one pond in Mount Elgin, Ontario for 10 years.
This decision amends Environmental Compliance Approval No. 3102-A9SNHB to permit the expansion of Presqu’ile Provincial Park, including the addition of up to 42 campsites within the group camping area and 42 trailer sites intended primarily for weekend use.
An amendment to an Environmental Compliance Approval (industrial sewage works) was approved for stormwater management works to service parking lots, a proposed building with rooftop control, and small pockets of paved areas of the existing Procter and Gamble Inc. site located at 355 University Avenue in Belleville.
This decision is for a new Environmental Compliance Approval (sewage) for the establishment, usage, and operation of the existing private sewage works servicing Pine Ridge Home Park (PRHP), located at 3303 County Road 32, Seeley’s Bay, Township of Leeds and the Thousand Islands, within the United Counties of Leeds and Grenville.
Instrument type:
Approval to register for a technical standard for air pollution (industry standard)
ERO number
025-1439
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
January 19, 2026 - March 5, 2026 (45 days) Closed
Last updated
We have granted approval to BBT Machining Inc., located in Sudbury, Ontario, to be registered under the Technical Standards Registry – Air Pollution. This facility will adhere to all technical and operational requirements in the Metal Finishers – Industry Standard.
January 23, 2026 - February 23, 2026 (31 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-26-000007 to Lakeshore Gold Corporation for early exploration activities. The decision is to issue the mineral exploration permit.
January 19, 2026 - February 18, 2026 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-26-000005 to MacDonald Mines Exploration Limited for early exploration activities. The decision is to issue the mineral exploration permit.
August 22, 2025 - October 6, 2025 (45 days) Closed
Last updated
The Company 1000792458 Ontario Ltd. withdrew the application for the operation of a Funeral and Crematorium, located in the City of Burlington, Ontario.
This proposal is to amend Environmental Compliance Approval (air & noise) No. 5523-7DKR4L issued to Royal Ready-Mix Inc. a ready mix concrete facility located at 2447 Royal Windsor Drive, Oakville.
This proposal is for a new Environmental Compliance Approval (sewage) for the establishment of stormwater management facilities owned by Battleshield North-West Limited, in support of a proposed warehouse development serving an emergency vehicle assembly plant located at 333 Corduroy Road, within the Industrial Park, in the Township of Russell.
This proposal is for a new Environmental Compliance Approval (sewage) for the construction of a private on-site sanitary treatment plant serving a proposed Gateway Casino and hotel complex, complete with two restaurants located at 255 Reive Boulevard in the Town of Innisfil, County of Simcoe, Ontario.
December 10, 2025 - January 9, 2026 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-25-000254 to Jacques Robert, 9640355 Canada Corp. for early exploration activities.
The decision is to issue the mineral exploration permit.
December 8, 2025 - January 7, 2026 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-25-000243 to Great bear Resources Ltd. for early exploration activities.
The decision is to: issue the mineral exploration permit.