We amended Renewable Energy Approval no. 3069-8NQQC7 for the Gesner Wind Energy Project in the Municipality of Chatham-Kent.
The amendment introduces additional restrictions on wind turbine operating requirements, reduces the total nameplate capacity, removes one wind turbine that was destroyed by fire and updates the facility’s owner’s address.
October 16, 2026 - November 30, 2026 (45 days) Open
Last updated
This proposal is for an amendment to the Environmental Compliance Approval (ECA) No. 5990-C3VNXP to construct a new septic system servicing a private 4-bedroom residence, in support of a proposed Phase 3 development of Highland Pines Campground located at 6634 5th Concession Road, Belwood, in the Township of Centre Wellington, Ontario.
October 16, 2026 - November 15, 2026 (30 days) Open
Last updated
This proposal is to renew existing Permit to Take Water No. 5724-BADPPN. Water will be taken from one well, one lake, and one pond for golf course irrigation and water supply purposes.
October 16, 2026 - November 30, 2026 (45 days) Open
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) from Greenspace Properties Inc., operating a Soil Processing and Remediation Facility, located at 249 Brant Road, in the Community of St. George, County of Brant, Ontario.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
026-0604
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
June 12, 2026 - July 13, 2026 (31 days) Closed
Last updated
Approval was granted for a site plan amendment to allow Amrize Canada Inc. to increase the annual tonnage limit for the site to 650,000 tonnes in the Township of North Dumfries
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
026-0723
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
July 13, 2026 - August 12, 2026 (30 days) Closed
Last updated
Approval was granted for a site plan amendment to allow GIP Paving Inc. to import 1,140,000 m3 of excess soil to backfill the site to match the surrounding grades and facilitate a more useable final landform in the City of Kingston.
October 15, 2026 - November 30, 2026 (46 days) Open
Last updated
The Ministry is seeking feedback on a proposed section 23 Order for a priority project in Innisfil (Stroud) as part of the province’s coordinated approach to planning for long-term growth in South Simcoe to support housing and job growth. This project was identified as part of ERO posting 026-0383. This does not indicate a decision.
October 15, 2026 - November 29, 2026 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval (ECA) for the establishment and operation of a waste disposal site for the processing of liquid soils generated through hydro-excavation and related activities located in Southwold.
October 15, 2026 - November 14, 2026 (30 days) Open
Last updated
This proposal is for a Permit to Take Water for snowmaking and water supply purposes to amend existing Permit to Take Water No. P-300-6170192634. Water will be taken from four wells for water supply and to increase snowmaking supply for a ski resort.
October 15, 2026 - November 14, 2026 (30 days) Open
Last updated
This proposal is for a Permit to Take Water for mine dewatering purposes to amend existing Permit to Take Water No. 8080-ALJGR5. Water will be taken from three wells for mine dewatering purposes at Copper Cliff mine.
October 15, 2026 - November 29, 2026 (45 days) Open
Last updated
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 8649-BH6NYU for Korzite Coatings Inc., operateing a paint manufacturing plant consisting of multiple mixing machines, chemical storage tanks, and packaging equipment located in the Township of Guelph/Eramosa, Ontario.
October 15, 2026 - November 29, 2026 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval (air & noise) for Miller Paving Limited for the operation of a mobile hot-mix asphalt facility to operate throughout the Province of Ontario.
September 3, 2026 - October 3, 2026 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-26-000142 to Renegade Gold Inc. for early exploration activities.
The decision is to: issue the mineral exploration permit.
August 13, 2026 - September 27, 2026 (45 days) Closed
Last updated
We have issued an Environmental Compliance Approval with Limited Operational Flexibility (air) to Pure Metal Galvanizing ULC, a hot dip galvanizing facility, located in the City of Brantford, Ontario.
October 15, 2026 - November 29, 2026 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval (industrial sewage) for one mobile sewage works for the treatment of process water, stored water, surface water, or groundwater.
Instrument type:
Approval of a municipality’s official plan
ERO number
026-0940
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
October 14, 2026 - November 13, 2026 (30 days) Open
Last updated
The Ministry of Municipal Affairs and Housing has received a new official plan from the Township of Chisholm for a decision. The purpose of the proposed plan is to achieve consistency with provincial policies and to establish goals, objectives, and local policies to manage and direct physical (land use) change within the Township.
Permit to Take Water No. P-300-8433805122 was issued to THE OSLER BLUFF SKI CLUB to renew Permit to Take Water No. 4502-BQ9LB5 for water supply purposes. Water will be taken from two sources (wells) in Clearview, Ontario for 10 years.