Instrument type:
Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
ERO number
013-3171
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
August 10, 2018 - September 24, 2018 (45 days) Closed
Last updated
Lavis Contracting Co.. Limited has applied for a Class A licence (Category 3 – Pit Above Water) to excavate aggregate from a pit of 18.9 hectares in size.
December 5, 2022 - January 19, 2023 (45 days) Closed
Last updated
A new Environmental Compliance Approval is granted to 1000118914 Ontario Inc. to bring the existing sewage system into compliance and install a new on-site sewage subsurface disposal system, with the maximum daily flow is 13,750 litres/day, to service Heather Lodge located at 14483 Highway 35, in the Township of Minden Hills, County of Haliburton.
This proposal is for a new Environmental Compliance Approval for 2771138 Ontario Inc. for the use and operation of a waste transfer and processing facility located at 6191 Atlantic Drive in the City of Mississauga, Ontario.
A Certificate of Property Use was issued to Hughson Business Space (Water St.) Corporation for the property located at 73 Water Street North in the City of Cambridge.
August 29, 2024 - October 13, 2024 (45 days) Closed
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air and noise) for R. W. Tomlinson Limited, operating a quarry and crushing plant, located at 122 Miller Road in the City of Kawartha Lakes, Ontario.
This proposal is for an Environmental Compliance Approval (air & noise) with Limited Operational Flexibility (air) for Bimeda-MTC Animal Health Inc., operating a veterinary pharmaceutical and animal health products manufacturing facility, located at 420 Beaverdale Road in Cambridge, Ontario.
An Environmental Compliance Approval has been issued to TC Industries of Canada Company located in Guelph, Ontario. The facility manufactures trackshoes and cutting bars.
August 19, 2021 - October 3, 2021 (45 days) Closed
Last updated
2629045 Ontario Limited requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued.
In collaboration with the government of Canada and many other partners, we have developed a Canada-Ontario Lake Erie Action Plan, which includes over 120 actions to reduce phosphorus loads to Lake Erie by 40 per cent.
February 16, 2024 - March 17, 2024 (30 days) Closed
Last updated
Permit to Take Water No. 2512-D4LG39 was issued to Decast Ltd. on May 13, 2024 to renew Permit to Take Water No. 5680-B9DRLC for industrial manufacturing purposes. Water will be taken from two (2) wells in the Township of Essa, County of Simcoe, Ontario for 10 years.
The approval is granted for a technical amendment to Environmental Compliance Approval (waste disposal site) No. A280285, for a non-hazardous and hazardous waste transfer and processing facility on a site located at 55 Vulcan Street, Toronto, Ontario.
The Director of Exploration has made a decision on the exploration permit application PR-20-000144 to Sparton Resources Incorporated for early exploration activities approximately 72 kilometers south east of Timmins, Ontario.
December 28, 2022 - February 11, 2023 (45 days) Closed
Last updated
Approval was issued for the establishment, usage and operation of non-municipal works, for the treatment of sanitary sewage from the Uni-Fab Metal Fabrication Facility and Garage Condominiums (staff accommodation).
We have received a notice of material change for the Black Fox Mill and Tailings Storage Facility that will result in McEwen Ontario (10393444 Canada Incorporated) submitting a closure plan amendment.
As part of our environmental assessment modernization efforts, we have amended the class Environmental Assessment for Provincial Transportation Facilities. This will reduce duplication and improve the process for lower-risk transportation infrastructure projects, while maintaining strong environmental oversight and protection.
September 1, 2021 - October 1, 2021 (30 days) Closed
Last updated
This decision is to renew and consolidate Permits To Take Water Nos. 3358-B9RRFG and 4688-B68QGY for Enbridge Pipelines Inc. for construction dewatering purposes in the Township of Blandford-Blenheim, the Township of North Dumfries and the City of Hamilton, Ontario.
This decision is to renew Permit to Take Water No.3585-85KGHG for Rubicon Minerals Corporation for industrial and drinking water supply purposes. Water will be taken from the East Bay of Red Lake, located in the Township of Bateman, Red Lake, Ontario.The permit was issued on June 24,2020 under permit No. 2332-BQQQ69.
Instrument type:
Approval to amend a municipality’s official plan
ERO number
019-6937
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
May 30, 2023 - June 29, 2023 (30 days) Closed
Last updated
A decision was made on October 9, 2024 to approve, with modifications, Official Plan Amendment No. 21 to the City of Quinte West Official Plan, as adopted by By-Law No. 2023-032. OPA No. 21 is a ten-year update to the city's OP and contains new and revised policies to guide growth and development over a 25-year planning horizon to the year 2046.
The Ministry of the Environment, Conservation and Parks (MECP) has revoked O. Reg. 115/20 so that the requirements under the Environmental Bill of Rights, 1993 (EBR) to post proposals for acts, policies, regulations and instruments on the Environmental Registry (ERO) and to consider the Statements of Environmental Values (SEV) are restored.