November 4, 2022 - December 4, 2022 (30 days) Closed
Last updated
The Ministry of Municipal Affairs and Housing has amended the Greenbelt Area boundary regulation (O. Reg 59/05) to add 13 new Urban River Valley areas and lands in the Paris Galt Moraine in Wellington County and remove 15 areas of land.
Our Ministry, along with Nawiinginokiima Forest Management Corporation and the Pic Forest Public Consultation Committee invite you to review and comment on the 2021-2031 Proposed Operations for the Pic Forest.
Korzite Coatings Inc., requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued.
An amendment to Environmental Compliance Approval (air and noise) No. 0501-867L9G with Operational Flexibility was issued to Carmeuse Lime (Canada) Limited, a limestone quarry and lime manufacturing facility located in Ingersoll, Ontario.
We approved a new multi-media Environmental Compliance Approval No. 9501-BG3JPF to the City of Stratford's Water Pollution Control Plant for the receipt of organic waste and the processing of the organic waste (anaerobic digestion) mixed with sludge generated at the plant to produce soil supplements and renewable natural gas.
Instrument type:
Approval to amend a municipality’s official plan
ERO number
019-1848
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
June 12, 2020 - July 12, 2020 (30 days) Closed
Last updated
We want to inform you that the Ministry of Municipal Affairs and Housing has received Regional Official Plan Amendment 33 (ROPA 33) from Peel Region for a decision. ROPA 33 proposes to expand the City of Mississauga's settlement area boundary within the Peel Region Official Plan by approximately 350 hectares.
We have approved amendments to Grand River’s Source Protection Plan and Assessment Report to ensure Ontario’s municipal drinking water sources continue to be protected. The amendments update existing water quality protections in Wellington County, include new water quantity protections in Brant County, with minor updates to other municipalities.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 1993-A9UKGD for EVOLVE RECYCLING INC., a facility which shreds and processes scrap tires to produce crumb rubber for further applications, located in the City of Brantford.
A decision was made on October 20, 2020 to approve Regional Official Plan Amendment 33 to the Regional Municipality of Peel’s Official Plan, as adopted by By-Law 18-2020, without modification.
Notice of this decision was issued on October 21, 2020 to the Regional Municipality of Peel.
We, along with Abitibi River Forest Management Inc., and the Cochrane Local Citizens’ Committee (LCC) invite you to participate in the development of the 2022-2032 Forest Management Plan for Abitibi River Forest.
January 3, 2020 - February 17, 2020 (45 days) Closed
Last updated
An amended Environmental Compliance Approval (Sewage) is granted to OBD Developments Inc., for the construction of storm sewers and the establishment of stormwater management works for the collection, transmission, treatment and disposal of stormwater run-off to service a family detached homes development in Georgian Bay, Ontario.
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 4152-96GGTN for Wabi Iron & Steel Corp., operating a foundry providing various wear and heat resistant properties for a wide range of industrial clients and applications located in New Liskeard, Ontario.
Our Ministry, along with Miisun Inc. and the Kenora Local Citizens’ Committee (LCC) invite you to review and comment on the invitation to participate materials for the Kenora Forest 2022-2032 Forest Management Plan (FMP).
We are advising the public, First Nation and Métis communities that the 10-year Timiskaming Forest Management Plan for the period of April 1, 2021 to March 31, 2031 is being prepared, and to invite the public to review the proposed long-term management direction for the forest.
An approval with Limited Operational Flexibility to amend Environmental Compliance Approval (air & noise) No. 8-3157-94-0063 was granted to RIC (1515 Thornton) Inc. operating as Northwood Transfer Station.
1725596 Ontario Limited has requested to withdraw their application for a new Environmental Compliance Approval (Sewage) for the installation of three on-site separate septic systems.
Ontario’s Forest Biomass Action Plan has been revised and approved following review of comments and feedback received through the Environmental Registry of Ontario, outreach to forest sector stakeholders, and consultation and engagement with Indigenous communities and organizations.