February 19, 2020 - April 4, 2020 (45 days) Closed
Last updated
A new Environmental Compliance Approval was granted to K & G Martin Holdings Inc. for stormwater management works serving a new gravel parking and display area located at 270 Arthur Street North in Elmira, Township of Woolwich.
Instrument type:
Permit for activities to achieve an overall benefit to a species
ERO number
019-2607
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
November 5, 2020 - December 5, 2020 (30 days) Closed
Last updated
The minister has issued an overall benefit permit under the Endangered Species Act, 2007 to 2555569 Ontario Inc. to allow for the construction of an access road that will impact two species at risk and their habitat. The permit includes actions to minimize adverse effects, benefit the species, and monitoring and reporting requirements.
A new Environmental Compliance Approval has been issued for establishment of sewage works for the collection, transmission, treatment and disposal of stormwater at the Bellamy-Lawrence Station, located at 510 Bellamy Road North, in the City of Toronto, on behalf of Toronto Hydro-Electric System Limited.
This proposal is for a new Environmental Compliance Approval for existing subsurface sewage disposal works rated at 750 litres per day, to service a cottage located at 468 Conestoga Lake Road 4 North, in Mapleton, Ontario.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-5303
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
March 29, 2022 - April 28, 2022 (30 days) Closed
Last updated
Approval was granted for a site plan amendment to allow Bruce Tait Construction Ltd. to amend the current site plan to allow a new entrance on the east side of the site in the Township of Secord.
This proposal is for a new Environmental Compliance Approval for upgrades to a transformer and oil containment system to service 510 Bellamy Road North, Toronto, Ontario.
Instrument type:
Approval for a consent (subject to conditions) in an area where there is no official plan in place
ERO number
019-5818
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
August 8, 2022 - September 7, 2022 (30 days) Closed
Last updated
Pursuant to Section 53 of the Planning Act, provisional consent was granted on September 28, 2022 in respect of Application 60-C-217403 for the creation of one new lot for recreational use on lands described as PIN 42180-0835, in unsurveyed Territory, in the District of Kenora. The last day this decision can be appealed is October 18, 2022.
Instrument type:
Approval to register for a technical standard for air pollution (industry standard)
ERO number
019-0529
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
March 25, 2020 - May 9, 2020 (45 days) Closed
Last updated
We have granted approval to Masterchrome Co. Ltd., located in Concord, Ontario, to be registered under the Technical Standards Registry – Air Pollution. This facility will adhere to all technical and operational requirements in the Metal Finishers – Industry Standard under the Local Air Quality Regulation (O. Reg. 419/05).
February 10, 2023 - March 27, 2023 (45 days) Closed
Last updated
We have retroactively issued a new Environmental Compliance Approval (industrial sewage) for compliance purposes to Ippolito Properties Limited for existing storm infrastructure and stormwater management facilities servicing a site located at 201 North Service Road, in the City of Burlington, Ontario.
Instrument type:
Permit for activities to achieve an overall benefit to a species
ERO number
019-1855
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
October 5, 2020 - November 4, 2020 (30 days) Closed
Last updated
The Minister of the Environment, Conservation and Parks has issued an overall benefit permit to the Region of Peel for construction activities that will impact Redside Dace, which is a species at risk. The permit includes actions to benefit the species and minimize adverse effects, as well as monitoring and reporting requirements.
Instrument type:
Permit for activities to achieve an overall benefit to a species
ERO number
013-4528
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
January 10, 2019 - February 24, 2019 (45 days) Closed
Last updated
The Minister has issued an amendment to an overall benefit permit under the Endangered Species Act, 2007 (ESA) for activities which will impact Species at Risk and their habitat, and which was originally issued to Schlegel Urban Development and is now being updated to Schlegel Urban Developments Corp.
February 26, 2019 - April 12, 2019 (45 days) Closed
Last updated
We have approved a new Environmental Compliance Approval No. 9626-BHAGTF for sewage works (process wastewater) for Willis Kerr Contracting Limited's Brissenden Pit, located at 1055 County Road 1, Township of North Dundas, County of Stormont, Dundas and Glengarry.
Instrument type:
Approval to register for a technical standard for air pollution (industry standard)
ERO number
013-2909
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
October 17, 2018 - December 1, 2018 (45 days) Closed
Last updated
We have granted approval for Southwest United Canada Inc. located in Vaughan, Ontario to be registered under the Technical Standards Registry – Air Pollution. This facility will adhere to all technical and operational requirements in the Metal Finishers – Industry Standard under the Local Air Quality Regulation (O. Reg. 419/05).
Approval for the establishment of industrial stormwater management Works to service an Industrial Sorting and Warehouse Facility land area of 10.39 hectares of a total 24.2 hectares for the collection, transmission, treatment and disposal of stormwater run-off to provide Enhanced Level water quality and quantity control.
A new Environmental Compliance Approval has been granted for an existing greenhouse stormwater management facility serving Konkle Farm & Greenhouses Ltd., located at 228 Robinson Road, Lot 1 Concession 1 Dunnville, Haldimand County.
August 4, 2022 - September 18, 2022 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for Air at this facility, has been granted to Lehigh Hanson Materials Limited, a ready-mix concrete manufacturing facility located in the Township of North Dumfries, Regional Municipality of Waterloo.
September 29, 2022 - November 13, 2022 (45 days) Closed
Last updated
A new Environmental Compliance Approval No. 5517-CTNSZG is granted to John Bairos Holdings Inc. for the stormwater management works serving the 0.81 ha of industrial development, located at 650 Weber Street North in the City of Waterloo.
November 12, 2020 - December 12, 2020 (30 days) Closed
Last updated
On December 18, 2020 the ministry issued an exploration permit located approximately 35 kilometres northeast of Whitesand First Nation, Ontario, in Ratte Lake Area, District of Thunder Bay,North West Region.