January 10, 2019 - February 24, 2019 (45 days) Closed
Last updated
An amendment to an Environmental Compliance Approval (Air & Noise) with Limited Operational Flexibility has been granted to CGC Inc., a manufacturer of gypsum wallboard located in Hagersville, Ontario.
This approval is for an Environmental Compliance Approval with Limited Operational Flexibility (air) for all emissions from Golden Valley Farms Inc., producing; bulk meat products including sausage, cured meats and other packaged meat products, located in the Township of Wellington North, Ontario.
An Environmental Compliance Approval (air & noise) with the Limited Operational Flexibility has been granted to Magna Powertrain Inc. operating as Unimotion-Gear, a manufacturing facility for drive plates/flexplates and reluctor wheels, located in the Town of Aurora, Ontario.
We have issued a new Environmental Compliance Approval (waste disposal) for GFL Environmental Inc. (GFL), for a solid non-hazardous waste transfer and processing facility located at 48 Sluse Road, Town of East Gwillimbury, for the transfer and processing of wood waste.
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air & Noise) which replaces all the current Environmental Compliance Approvals for Air & Noise at this facility for all emissions from Stelco Inc., located in Haldimand County, Ontario.
Linamar Corporation, operating as Powercor Mfg., confirmed the withdrawal of their application for an amendment to the Environmental Compliance Approval (air & noise) No. 4451-9MCGCR. The application is considered withdrawn and no approval was issued.
September 6, 2024 - October 21, 2024 (45 days) Closed
Last updated
We issued an Environmental Compliance Approval with Limited Operational Flexibility (multi-media) to FCA Canada Inc., an automotive assembly facility located in the City of Windsor, Ontario.
September 12, 2024 - October 27, 2024 (45 days) Closed
Last updated
An amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 3535-BVPSS2 was issued to Cosmetica Laboratories Inc., a cosmetic and skin care manufacturing facility located in the City of Toronto, Ontario.
September 6, 2024 - November 4, 2024 (59 days) Closed
Last updated
We have issued an Environmental Compliance Approval (air & noise) to Algoma Steel Inc., an integrated iron and steel manufacturing facility located in Sault Ste. Marie, Ontario.
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) from Yellowline Asphalt Products Ltd., a liquid asphalt cement storage and distribution facility, located at 70 Hobson Road in the City of Hamilton, Ontario.
November 9, 2018 - December 24, 2018 (45 days) Closed
Last updated
We have denied the requested Environmental Compliance Approval (waste site) 18-LON-87781 for The Stool Bus as the site was not appropriate for hauled sewage disposal.
February 27, 2024 - April 12, 2024 (45 days) Closed
Last updated
An amendment to the existing Environmental Compliance Approval (waste disposal site - transfer) No. A620088 for Central Sanitation Inc. was issued for the use and operation of two Hauled Sewage Storage Lagoons with the total capacity of 11,360 cubic metres, located at 1980 Petrolia Line in St. Clair, Ontario.
August 28, 2024 - October 12, 2024 (45 days) Closed
Last updated
Approval is granted for a new Environmental Compliance Approval (air & noise) for 1685300 Ontario Inc., operating a portable aggregates crushing plant at various locations across the Province of Ontario.
February 13, 2018 - March 30, 2018 (45 days) Closed
Last updated
Real Alloy Canada Ltd. has requested to withdraw their application for the renewal of the Limited Operational Flexibility for Environmental Compliance Approval (Air & Noise) No. 4943-8MDQY2.