The approval is for the establishment of works for the treatment of sanitary sewage and subsurface disposal of treated effluent from Nevin Morrissey Dunn new residence and a carriage house (bunkie) located on the other side of the municipal road, rated at a maximum daily flow of 4875 litres per day.
This proposal is for the issuance of an Environmental Compliance Approval 20-KEN--43408 for Asselin Transportation and Storage Ltd. for a hauled sewage disposal site in Miscampbell, Ontario.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-0933
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
January 23, 2020 - February 24, 2020 (32 days) Closed
Last updated
Approval was granted for a site plan amendment to allow Erie Sand and Gravel Ltd to locate a new entrance to Hudder’s Pit in the Municipality of Leamington.
February 6, 2020 - March 22, 2020 (45 days) Closed
Last updated
An amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) was granted to Canada Colors and Chemicals Limited for a facility that blends resins, colours and additives to produce coloured plastic pellets used by other manufactures to produce coloured plastic parts.
February 1, 2021 - March 18, 2021 (45 days) Closed
Last updated
An amendment to the Environmental Compliance Approval (air & noise) No. 5940-7P6LUS has been issued to The Sarjeant Company Limited for the operation of one portable ready-mix concrete batching plant within Ontario.
August 29, 2024 - October 13, 2024 (45 days) Closed
Last updated
Approval was granted for a new Environmental Compliance Approval (air & noise) for Oxford Pallet and Recyclers Limited, operating two mobile grinder units equipped with diesel-fired engines to produce wood chips at various locations across the Province of Ontario.
September 20, 2019 - November 4, 2019 (45 days) Closed
Last updated
Changes have been made to the Aggregate Resources Act to reduce burdens for business while maintaining strong protection for the environment and managing impacts to communities.
July 14, 2017 - September 29, 2017 (77 days) Closed
Last updated
The amending regulations to the Building Code, O. Reg. 88/19, was filed on May 2, 2019. The amending regulation is available on e-Laws, Ontario’s online databased of statues and regulations. See The Building Code is a regulation under the Building Code Act, 1992 (BCA).
This proposal is for the issuance of an Environmental Compliance Approval 20-KEN-60418 for Asselin Transportation and storage Ltd. for a hauled sewage disposal site in Rainy River, Ontario.
This proposal is for the issuance of an Environmental Compliance Approval 20-KEN-82275 for Asselin Transportation and Storage Ltd. for a hauled sewage disposal site in Rainy River, Ontario.
February 12, 2019 - March 29, 2019 (45 days) Closed
Last updated
We have issued a new Environmental Compliance Approval (Air & Noise) for And-Son Contracting & Gravel Enterprises Incorporated for the operation of a mobile wood waste processing facility.
October 31, 2025 - December 15, 2025 (45 days) Closed
Last updated
This proposal is to amend Environmental Compliance Approval No. 5711-BX2TTQ (sewage) to include previously constructed stormwater management works consisting of an oil/grit separator and existing stormwater management ponds to provide quality and quantity control, discharging into municipal storm ditches at the AOC RESINS AND COATINGS COMPANY site.
We have approved the issuance of an amendment to Environmental Compliance Approval No. A920034 for Direct Genetics Inc. (Jones Pumping and Coulter Pumping) for a hauled sewage disposal site.
An Environmental Compliance Approval (air & noise) has been granted to Lotus Funeral and Cremation Centre Inc., a cremation facility located in the City of Toronto, Ontario.
June 23, 2021 - September 21, 2021 (90 days) Closed
Last updated
The Ministry of Municipal Affairs and Housing sought feedback on an approach to update the Projection Methodology Guideline to reflect the land use planning policies in 2021. The Province considered the feedback received in the development of Proposed Updates to the Projection Methodology Guideline available for public input (see ERO#025-0844).
Instrument type:
Approval of an amendment to the Niagara Escarpment Plan
ERO number
019-4395
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
September 24, 2021 - November 23, 2021 (60 days) Closed
Last updated
A decision was made to approve the application to amend the Niagara Escarpment Plan to allow for a site-specific change to the Land Use Designation of the subject property from Mineral Resource Extraction Area to Escarpment Natural Area and Escarpment Protection Area.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-7133
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
May 30, 2023 - June 29, 2023 (30 days) Closed
Last updated
Approval was granted for a licence amendment to allow Bethel Sand & Gravel Inc. to increase the number of tonnes of aggregate to be removed annually for Licence No. 5678, operating in the Township of Centre Wellington, County of Wellington.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-0041
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
May 23, 2019 - June 24, 2019 (32 days) Closed
Last updated
The licensee has received consent for a site plan amendment to allow for roadside setbacks along County Road 31 and Road 5 East to be reduced to 15 metres, from the existing 30 metres, and to backfill the former setback area (between 15 metres to 30 metres) to original grade.